Pub. L. 108-137, tit. I, under "DEPARTMENT OF THE ARMY"

DEPARTMENT OF THE ARMY

EnactedYear: 2003Length: 3,111 wordsOfficial source
DEPARTMENT OF THE ARMY Corps of Engineers—Civil The following appropriations shall be expended under the direction of the Secretary of the Army and the supervision of the Chief of Engineers for authorized civil functions of the Department of the Army pertaining to rivers and harbors, flood control, shore protection, aquatic ecosystem restoration, and related purposes. General Investigations For expenses necessary for the collection and study of basic information pertaining to river and harbor, flood control, shore protection, aquatic ecosystem restoration, and related projects, restudy of authorized projects, miscellaneous investigations, and, when authorized by law, surveys and detailed studies and plans and specifications of projects prior to construction, $116,949,000, to remain available until expended: Provided, That for the Ohio Riverfront, Cincinnati, Ohio, project, the cost of planning and design undertaken by non-Federal interests shall be credited toward the non-Federal share of project design costs: Provided further, That in conducting the Southwest Valley Flood Damage Reduction Study, Albuquerque, New Mexico, the Secretary of the Army, acting through the Chief of Engineers, shall include an evaluation of flood damage reduction measures that would otherwise be excluded from the feasibility analysis based on policies regarding the frequency of flooding, the drainage areas, and the amount of runoff: Provided further, That the Secretary of the Army, acting through the Chief of Engineers, is directed to use $250,000 for preconstruction engineering and design of Waikiki Beach, Oahu, 117 STAT. 1828 Hawaii, the project to be designed and evaluated, as authorized: Provided further, That the Secretary of the Army, acting through the Chief of Engineers, is directed to use $100,000 for the continuation and completion of feasibility studies of Kihei Beach, Maui, Hawaii: Provided further, That any recommendations for a National Economic Development Plan shall be accepted notwithstanding the extent of recreation benefits supporting the project features, in view of the fact that recreation is extremely important in sustaining and increasing the economic well-being of the State of Hawaii and the nation. Construction, General For the prosecution of river and harbor, flood control, shore protection, aquatic ecosystem restoration, and related projects authorized by law; and detailed studies, and plans and specifications, of projects (including those for development with participation or under consideration for participation by States, local governments, or private groups) authorized or made eligible for selection by law (but such studies shall not constitute a commitment of the Government to construction), $1,722,319,000, to remain available until expended, of which such sums as are necessary to cover the Federal share of construction costs for facilities under the Dredged Material Disposal Facilities program shall be derived from the Harbor Maintenance Trust Fund as authorized by Public Law 104–303; and of which such sums as are necessary pursuant to Public Law 99–662 shall be derived from the Inland Waterways Trust Fund, for one-half of the costs of construction and rehabilitation of inland waterways projects, including rehabilitation costs for Lock and Dam 11, Mississippi River, Iowa; Lock and Dam 19, Mississippi River, Iowa; Lock and Dam 24, Mississippi River, Illinois and Missouri; and Lock and Dam 3, Mississippi River, Minnesota: Provided, That using $9,280,000 of the funds appropriated herein, the Secretary of the Army, acting through the Chief of Engineers, is directed to continue construction of the Dallas Floodway Extension, Texas, project, including the Cadillac Heights feature, generally in accordance with the Chief of Engineers report dated December 7, 1999: Provided further, That the Secretary of the Army is directed to accept advance funds, pursuant to section 11 of the River and Harbor Act of 1925, from the non-Federal sponsor of the Los Angeles Harbor, California, project authorized by section 101(b)(5) of Public Law 106–541: Provided further, That the Secretary of the Army, acting through the Chief of Engineers, is directed to use $750,000 of the funds provided herein to continue construction of the Hawaii Water Management Project: Provided further, That the Secretary of the Army, acting through the Chief of Engineers, is directed to use $2,500,000 of the funds appropriated herein to continue construction of the navigation project at Kaumalapau Harbor, Hawaii: Provided further, That the Secretary of the Army, acting through the Chief of Engineers, is directed to use $6,000,000 of the funds provided herein for the Dam Safety and Seepage/Stability Correction Program to continue construction of seepage control features and to design and construct repairs to the tainter gates at Waterbury Dam, Vermont: Provided further, That the Secretary of the Army, acting through the Chief of Engineers, is directed to proceed with the construction of the New York and New Jersey Harbor project, 50-foot deepening element, upon execution of the Project Cooperation Agreement: Provided117 STAT. 1829further, That no funds made available under this Act or any other Act for any fiscal year may be used by the Secretary of the Army to carry out the construction of the Port Jersey element of the New York and New Jersey Harbor or reimbursement to the Local Sponsor for the construction of the Port Jersey element until commitments for construction of container handling facilities are obtained from the non-Federal sponsor for a second user along the Port Jersey element: Provided further, That funds appropriated in this Act for the preservation and restoration of the Florida Everglades shall be made available for expenditure unless: (1) the Secretary of the Army, not later than 30 days after the date of enactment of this Act, transmits to the State of Florida and the Committees on Appropriations of the House of Representatives and the Senate a report containing a finding and supporting materials indicating that the waters entering the A.R.M. Loxahatchee National Wildlife Refuge and Everglades National Park do not meet the water quality requirements set forth in the Consent Decree entered in United States v. South Florida Water Management District; (2) the State fails to submit a satisfactory plan to bring the waters into compliance with the water quality requirements within 45 days of the date of the report; (3) the Secretary transmits to the State and the Committees a follow-up report containing a finding that the State has not submitted such a plan; and (4) either the Committee on Appropriations of the House of Representatives or the Senate issues a written notice disapproving of further expenditure of the funds: Provided further, That the Secretary of the Army shall provide the State of Florida with notice and an opportunity to respond to any determination of the Secretary under the preceding proviso before the determination becomes final: Provided further, That the Secretary of the Army, acting through the Chief of Engineers, is directed to use $17,000,000 of the funds appropriated herein to proceed with planning, engineering, design or construction of the Grundy, Buchanan County, and Dickenson County, Virginia, elements of the Levisa and Tug Forks of the Big Sandy River and Upper Cumberland River Project: Provided further, That the Secretary of the Army, acting through the Chief of Engineers, is directed to use $5,400,000 of the funds appropriated herein to proceed with the planning, engineering, design or construction of the Lower Mingo County, Upper Mingo County, Wayne County, McDowell County, West Virginia, elements of the Levisa and Tug Forks of the Big Sandy River and Upper Cumberland River Project: Provided further, That the Secretary of the Army, acting through the Chief of Engineers, is directed to continue the Dickenson County Detailed Project Report as generally defined in Plan 4 of the Huntington District Engineer’s Draft Supplement to the section 202 General Plan for Flood Damage Reduction dated April 1997, including all Russell Fork tributary streams within the County and special considerations as may be appropriate to address the unique relocations and resettlement needs for the flood prone communities within the County: Provided further, That the Secretary of the Army, acting through the Chief of Engineers, is directed to proceed with the construction of the Seward Harbor, Alaska, project, in accordance with the Report of the Chief of Engineers, dated June 8, 1999, and the economic justification contained therein: Provided further, That the Secretary of the Army, acting through the Chief of Engineers, is directed and authorized to continue the work to replace and upgrade the dam and all 117 STAT. 1830 connections to the existing system at Kake, Alaska: Provided further, That the Secretary of the Army, acting through the Chief of Engineers, is directed to proceed with the construction of the Wrangell Harbor, Alaska, project in accordance with the Chief of Engineer’s report dated December 23, 1999: Provided further, That the Secretary of the Army, acting through the Chief of Engineers, is directed to use $33,400,000 of the funds appropriated herein for the Clover Fork, City of Cumberland, Town of Martin, Pike County (including Levisa Fork and Tug Fork Tributaries), Bell County, Harlan County in accordance with the Draft Detailed Project Report dated January 2002, Floyd County, Martin County, Johnson County, and Knox County, Kentucky, detailed project report, elements of the Levisa and Tug Forks of the Big Sandy River and Upper Cumberland River: Provided further, That the Secretary of the Army, acting through the Chief of Engineers, is directed to use funds appropriated for the navigation project, Tampa Harbor, Florida, to carry out, as part of the project, construction of passing lanes in an area approximately 3.5 miles long, centered on Tampa Bay Cut B, if the Secretary determines that such construction is technically sound, environmentally acceptable, and cost effective: Provided further, That using $200,000 appropriated herein, the Secretary of the Army, acting through the Chief of Engineers, may develop an environmental impact statement for introducing non-native oyster species into the Chesapeake Bay: Provided further, That during preparation of the environmental impact statement, the Secretary may establish a scientific advisory body consisting of the Virginia Institute of Marine Science, the University of Maryland, and other appropriate research institutions to review the sufficiency of the environmental impact statement: Provided further, That in addition, the Secretary shall give consideration to the findings and recommendations of the National Academy of Sciences report on the introduction of non-native oyster species into the Chesapeake Bay in the preparation of the environmental impact statement: Provided further, That notwithstanding the cost sharing provisions of section 510(d) of the Water Resources Development Act of 1996 (110 Stat. 3760), the preparation of the environmental impact statement shall be cost shared 50 percent Federal and 50 percent non-Federal, for an estimated cost of $2,000,000: Provided further, That the non-Federal sponsors may meet their 50 percent matching cost share through in-kind services: Provided further, That the Secretary determines that work performed by the non-Federal sponsors is reasonable, allowable, allocable, and integral to the development of the environmental impact statement: Provided further, That the Secretary of the Army, acting through the Chief of Engineers, is directed to construct the Miami Harbor project, as recommended in the Miami Harbor Letter Report dated August 2002, as revised February 2003: Provided further, That using $500,000 of the funds appropriated herein, the Secretary of the Army, acting through the Chief of Engineers, is authorized and directed to plan, design, and initiate reconstruction of the Cape Girardeau, Missouri, project, originally authorized by the Flood Control Act of 1950, at an estimated total cost of $9,000,000, with cost sharing on the same basis as cost sharing for the project as originally authorized, if the Secretary determines that the reconstruction is technically sound and environmentally acceptable: Provided further, That the planned reconstruction shall be based on the most cost-effective engineering solution and shall require 117 STAT. 1831no further economic justification: Provided further, That the Secretary is directed to use $5,000,000 of the funds appropriated herein to undertake the restoration of Tar Creek and Vicinity, Oklahoma, project. Flood Control, Mississippi River and Tributaries, Arkansas, Illinois, Kentucky, Louisiana, Mississippi, Missouri, and Tennessee For expenses necessary for the flood damage reduction program for the Mississippi River alluvial valley below Cape Girardeau, Missouri, as authorized by law, $324,222,000, to remain available until expended: Provided, That the Secretary of the Army, acting through the Chief of Engineers, using $12,000,000 of the funds provided herein, is directed to continue design and real estate activities and to initiate the pump supply contract for the Yazoo Basin, Yazoo Backwater Pumping Plant, Mississippi: Provided further, That the pump supply contract shall be performed by awarding continuing contracts in accordance with 33 U.S.C. 621: Provided further, That the Secretary of the Army, acting through the Chief of Engineers is directed, with funds previously appropriated, to continue construction of water withdrawal features of the Grand Prairie, Arkansas, project. Operation and Maintenance, General For expenses necessary for the operation, maintenance, and care of existing river and harbor, flood and storm damage reduction, aquatic ecosystem restoration, and related projects; for providing security for infrastructure owned and operated by, or on behalf of, the United States Army Corps of Engineers, including administrative buildings and facilities, laboratories, and the Washington Aqueduct; for the maintenance of harbor channels provided by a State, municipality, or other public agency that serve essential navigation needs of general commerce, where authorized by law; and for surveys and charting of northern and northwestern lakes and connecting waters, clearing and straightening channels, and removal of obstructions to navigation, $1,967,925,000, to remain available until expended, of which such sums as become available in the Harbor Maintenance Trust Fund, pursuant to Public Law 99–662 may be derived from that fund, and of which such sums as become available from the special account for the United States Army Corps of Engineers established by the Land and Water Conservation Act of 1965, as amended (16 U.S.C. 460l–6a(i)), may be derived from that account for resource protection, research, interpretation, and maintenance activities related to resource protection in the areas at which outdoor recreation is available; and of which such sums as become available under section 217 of the Water Resources Development Act of 1996, Public Law 104–303, shall be used to cover the cost of operation and maintenance of the dredged material disposal facilities for which fees have been collected: Provided, That of funds appropriated herein, for the Intracoastal Waterway, Delaware River to Chesapeake Bay, Delaware and Maryland, the Secretary of the Army, acting through the Chief of Engineers, is directed to reimburse the State of Delaware for normal operation and maintenance costs incurred by the State of Delaware for the SR1 Bridge from station 58+00 to station 293+00 between October 1, 2003, and September 30, 2004: Provided 117 STAT. 1832 further, That the Secretary of the Army, acting through the Chief of Engineers, is directed to use funds appropriated herein to rehabilitate the existing dredged material disposal site for the project for navigation, Bodega Bay Harbor, California, and to continue maintenance dredging of the Federal channel: Provided further, That the Secretary shall make suitable material excavated from the site as part of the rehabilitation effort available to the non-Federal sponsor, at no cost to the Federal Government, for use by the non-Federal sponsor in the development of public facilities: Provided further, That the Corps of Engineers shall not allocate any funds to deposit dredged material along the Laguna Madre portion of the Gulf Intracoastal Waterway except at the placement areas specified in the Dredged Material Management Plan in section 2.11 of the Final Environmental Impact Statement for Maintenance Dredging of the Gulf Intracoastal Waterway, Laguna Madre, Texas, Nueces, Kleberg, Kenedy, Willacy, and Cameron Counties, Texas, prepared by the Corps of Engineers dated September 2003: Provided further, That nothing in the above proviso shall prevent the Corps of Engineers from performing necessary maintenance operations along the Gulf Intracoastal Waterway if the following conditions are met: if the Corps proposes to use any placement areas that are not currently specified in the Dredged Material Management Plan and failure to use such alternative placement areas will result in the closure of any segment of the Gulf Intracoastal Waterway, then such proposal shall be analyzed in an Environmental Impact Statement (EIS) and comply with all other applicable requirements of the National Environmental Policy Act, 42 U.S.C. 4321, et seq., and all other applicable State and Federal laws, including the Clean Water Act, 33 U.S.C. 1251 et seq., the Endangered Species Act, 16 U.S.C. 1531 et seq., and the Coastal Zone Management Act, 16 U.S.C. 1451 et seq.: Provided further, That $15,000,000 is provided to be used by the Secretary of the Army, acting through the Chief of Engineers, to repair, restore, and clean up projects and facilities of the Corps of Engineers and dredge navigation channels, restore and clean out area streams, provide emergency stream bank protection, restore other crucial public infrastructure (including water and sewer facilities), document flood impacts, and undertake other flood recovery efforts considered necessary by the Chief of Engineers: Provided further, That the Secretary of the Army is directed to use $75,000 of the funds appropriated herein to remove the weir feature of the project for flood damage reduction, Mayfield Creek and Tributaries, Kentucky, constructed pursuant to section 205 of the Flood Control Act of 1948 (33 U.S.C. 701s), without any further environmental or economic analysis or study: Provided further, That the Secretary of the Army, acting through the Chief of Engineers, is directed to use $250,000 of the funds appropriated herein for sediment removal and dam repair at Junaluska, North Carolina. Regulatory Program For expenses necessary for administration of laws pertaining to regulation of navigable waters and wetlands, $140,000,000, to remain available until expended. 117 STAT. 1833 Formerly Utilized Sites Remedial Action Program For expenses necessary to clean up contamination from sites in the United States resulting from work performed as part of the Nation’s early atomic energy program, $140,000,000, to remain available until expended. General Expenses For expenses necessary for general administration and related civil works functions in the headquarters of the United States Army Corps of Engineers, the offices of the Division Engineers, the Humphreys Engineer Center Support Activity, the Institute for Water Resources, the United States Army Engineer Research and Development Center, and the United States Army Corps of Engineers Finance Center, $160,000,000, to remain available until expended: Provided, That no part of any other appropriation provided in title I of this Act shall be available to fund the activities of the Office of the Chief of Engineers or the executive direction and management activities of the division offices: Provided further, That none of these funds shall be available to support an office of congressional affairs within the executive office of the Chief of Engineers. Administrative Provisions Appropriations in this title shall be available for official reception and representation expenses (not to exceed $5,000); and during the current fiscal year the Revolving Fund, Corps of Engineers, shall be available for purchase (not to exceed 100 for replacement only) and hire of passenger motor vehicles.
Pub. L. 108-137, tit. I, under "DEPARTMENT OF THE ARMY": DEPARTMENT OF THE ARMY | Justis AI