Pub. L. 100-675, tit. II, sec. 203
AUTHORIZATION OF PROJECT.
SEC. 203. AUTHORIZATION OF PROJECT. (a) Canal Lining Authorized.—The Secretary, in order to reduce the seepage of water, is authorized to— (1) construct a new lined canal or to line the previously unlined portions of the All American Canal from the vicinity of Pilot Knob to Drop 4 and its Coachella Branch from Siphon 7 to Siphon 32, or construct seepage recovery facilities in the vicinity of Pilot Knob to Drop 4, including measures to protect public safety; and (2) implement measures for the replacement of incidental fish and wildlife values adjacent to the canals foregone as a result of the lining of the canal or mitigation of resulting impacts on fish and wildlife resources from construction of a new canal, or a portion thereof. Such measures shall be on an acre-for-acre 102 STAT. 4007basis, based on ecological equivalency, and shall be implemented concurrent with construction of the works. The Secretary shall make available such public lands as he deems appropriate to meet the requirements of this subsection. The Secretary is authorized to develop ground water, with a priority given to nonpotable sources, from public lands to supply water for fish and wildlife purposes. (b) Operation and Maintenance Determination.—The Secretary shall determine the impact of the works on the cost of operation and maintenance and the existing regulating and storage capacity of the All American Canal and its Coachella Branch. If the works result in any added operation and maintenance costs which exceed the benefits derived from increasing the regulating and storage capacity of the canals to the Imperial Irrigation District or the Coachella Valley Water District, the Secretary shall include such costs in the funding agreement for the works. (c) Construction and Funding Agreement.—The Secretary, subject to the provision of section 205 of this title, may enter into an agreement or agreements with one or more of the California Contractors for the construction or funding of all or a portion of the works authorized in subsection (a) of this section. The Secretary shall ensure that such agreement or agreements include provisions setting forth— (1) the responsibilities of the parties to the agreement for funding and assisting with implementing all the duties of the Secretary identified in subsections (a) and (b) of this section; (2) the obligation of the Participating Contractors to pay the additional costs identified in subsection (b) of this section as a result of the works; (3) the procedures and requirement for approval and acceptance by the Secretary of such works, including approval of the quality of construction, measures to protect the public health and safety, mitigation or replacement, as appropriate, of fish and wildlife resources or values, and procedures for operation, maintenance, and protection of such works; (4) the rights, responsibilities, and liabilities of each party to the agreement; (5) the term of such agreements which shall not exceed 55 years and may be renewed if consented to by Imperial Irrigation District and Coachella Valley Water District according to their respective interests in the conserved water. If the funding agreements are not renewed, the Participating Contractors shall be compensated by the Imperial Irrigation District or the Coachella Valley Water District for their participation in the cost of the works. Such compensation shall be equal to the replacement value of the works less depreciation. Such depreciated value is to be based upon an engineering analysis by the Secretary of the remaining useful life of the works at the expiration of the funding agreements; (6) the obligation of the Participating Contractors or the United States for repair or other corrective action which would not have occurred in the absence of the works in the case of earthquake or other acts of God; (7) the obligation of the Participating Contractors or the United States to hold harmless Imperial Irrigation District and Coachella Valley Water District for liability to third parties 102 STAT. 4008which occurs after the Secretary accepts the works and would not have occurred in the absence of the works; and, (8) the requirement that the remaining net obligations due the United States for construction of the All American Canal owed on the date of enactment of this Act be paid by the Participating Contractors. (d) Title to the Works.—A Participating Contractor shall not receive title to any works constructed pursuant to this section by virtue of its participation in the funding for the works. Title to all such works shall remain with the United States. Upon completion of the works and upon request by an All American Canal Contractor (City of San Diego, Imperial Irrigation District, or Coachella Valley Water District) for transfer of title of the All American Canal, its Coachella Branch, and appurtenant structures below Syphon Drop (including the works constructed pursuant to this section), the Secretary shall, within 90 days, take such necessary action as the Secretary deems appropriate to complete transfer of title to the requesting contractor, according to the contractor’s respective interest unless the Secretary determines that such transfer would impair any existing rights of other All American Canal contractors, the rights or obligations of the United States, or would inhibit the Secretary’s ability to fulfill his responsibility under the Project Act or other applicable law. (e) Authorization of Appropriations.— (1) No Federal funds are authorized to be appropriated to the Secretary for construction of the works described in subsection (a)(1) of this section. (2) The Secretary is authorized to receive funds in advance from one or more Participating Contractors pursuant to the Contributed Funds Act of March 4, 1921 (41 Stat. 1401) under terms and conditions acceptable to the Secretary in order to carry out the Secretary’s responsibilities under subsections (a), (b), and (c) of this section.