Pub. L. 109-103, tit. II, sec. 203

Pub. L. 109-103, tit. II, sec. 203

EnactedYear: 2005Length: 286 wordsOfficial source
Sec. 203. (a) Section 1(a) of the Lower Colorado Water Supply Act (Public Law 99–655) is amended by adding at the end the following: “The Secretary is authorized to enter into an agreement or agreements with the city of Needles or the Imperial Irrigation District for the design and construction of the remaining stages of the Lower Colorado Water Supply Project on or after November 1, 2004, and the Secretary shall ensure that any such agreement or agreements include provisions setting forth: (1) the responsibilities of the parties to the agreement for design and construction; (2) the locations of the remaining wells, discharge pipelines, and power transmission lines; (3) the remaining design capacity of up to 5,000 acre-feet per year which is the authorized capacity less the design capacity of the first stage constructed; (4) the procedures and requirements for approval and acceptance by the Secretary of the remaining stages, including approval of the quality of construction, measures to protect the public health and safety, and procedures for protection of such stages; (5) the rights, responsibilities, and liabilities of each party to the agreement; and (6) the term of the agreement.”.(b) Section 2(b) of the Lower Colorado Water Supply Act (Public Law 99–655) is amended by adding at the end the following: “Subject to the demand of such users along or adjacent to the Colorado River for Project water, the Secretary is further authorized to contract with additional persons or entities who hold Boulder Canyon Project Act section 5 contracts for municipal and industrial uses within the State of California for the use or benefit of Project water under such terms as the Secretary determines will benefit the interest of Project users along the Colorado River.”.
Pub. L. 109-103, tit. II, sec. 203 | Justis AI