Pub. L. 109-103, tit. I, sec. 134

Project Modification.—

EnactedYear: 2005Length: 241 wordsOfficial source
Sec. 134. Project Modification.—(a) In General.—The project for flood damage reduction, environmental restoration, recreation, Johnson Creek, Arlington, Texas, authorized by section 101(b)(14) of the Water Resources Development Act of 1999 (113 Stat. 280–281) is modified—(1) to deauthorize the ecosystem restoration portion of the project that consists of approximately 90 acres of land located between Randol Mill and the Union Pacific East/West line; and (2) to authorize the Secretary of the Army to design and construct an ecosystem restoration project on lands identified in subsection (c) that will provide the same or greater level of national ecosystem restoration benefits as the portion of the project described in paragraph (1).(b) Credit Toward Federal Share.—The Secretary of the Army shall credit toward the Federal share of the cost of the modified project the costs incurred by the Secretary to carry out the project as originally authorized under section 101(b)(14) of the Water Resources Development Act of 1999 (113 Stat. 280). The non-Federal interest shall not be responsible for reimbursing the Secretary for any amount credited under this subsection.(c) Comparable Property.—Not later than 6 months after the date of enactment of this Act, the City of Arlington, Texas, shall identify lands, acceptable to the Secretary of the Army, amounting to not less than 90 acres within the City, where an ecosystem restoration project may be constructed to provide the same or greater level of National ecosystem restoration benefits as the land described in subsection (a)(1).
Pub. L. 109-103, tit. I, sec. 134: Project Modification.— | Justis AI