Pub. L. 109-163, div. B, tit. XXVIII, subtit. A, sec. 2807
USE OF DESIGN-BUILD SELECTION PROCEDURES TO ACCELERATE DESIGN EFFORT IN CONNECTION WITH MILITARY CONSTRUCTION PROJECTS.
SEC. 2807. USE OF DESIGN-BUILD SELECTION PROCEDURES TO ACCELERATE DESIGN EFFORT IN CONNECTION WITH MILITARY CONSTRUCTION PROJECTS.(a) Clarification of Condition on Contracts.—Paragraph (2) of subsection (f) of section 2305a of title 10, United States Code, is amended to read as follows:“(2) Any military construction contract that provides for an accelerated design effort, as authorized by paragraph (1), shall include as a condition of the contract that the liability of the United States in a termination for convenience before funds are first made available for construction may not exceed an amount attributable to the final design of the project.”.(b) Duration of Authority; Report.—Paragraph (4) of such subsection is amended by striking “2007” each place it appears and inserting “2008”.