Pub. L. 109-234, tit. II, ch. 3, under "DEPARTMENT OF DEFENSE—CIVIL"
DEPARTMENT OF DEFENSE—CIVIL
DEPARTMENT OF DEFENSE—CIVIL DEPARTMENT OF THE ARMY Corps of Engineers—Civil Investigations For an additional amount for “Investigations” for necessary expenses related to the consequences of Hurricane Katrina and other hurricanes of the 2005 season, $3,300,000, to remain available until expended: Provided, That the amount provided under this heading is designated as an emergency requirement pursuant to section 402 of H. Con. Res. 95 (109th Congress), the concurrent resolution on the budget for fiscal year 2006: Provided further, That the Secretary of the Army, acting through the Chief of Engineers, utilizing $3,300,000 of the funds provided herein shall develop a comprehensive plan, at full Federal expense, to deauthorize deep draft navigation on the Mississippi River-Gulf Outlet, Louisiana, extending from the Gulf of Mexico to the Gulf Intracoastal Waterway: Provided further, That, not later than 6 months after the date of enactment of this Act, the Secretary shall submit an interim report to Congress comprising the plan: Provided further, That the Secretary shall refine the plan, if necessary, to be fully consistent, integrated, and included in the final report to be issued in December 2007 for the Louisiana Coastal Protection and Restoration Plan: Provided further, the Secretary shall provide to the Congress a report, by not later than 90 days after the date of enactment of this Act, describing, for the period beginning on the date on which the individual system components for hurricane and storm damage reduction were constructed and ending on the date on which the report is prepared, the difference between the vertical settlement of the system that is attributable to the settling of levees and floodwalls or subsidence versus the vertical grade deficiencies that are attributable to new storm data that may require a higher level of vertical protection in order to comply with 100-year floodplain certification and standard project hurricane.120 STAT. 454 CONSTRUCTION For an additional amount for “Construction” for necessary expenses related to the consequences of Hurricane Katrina and other hurricanes of the 2005 season, $549,400,000, to remain available until expended, of which up to $20,200,000 may be used to reduce the risk of storm damage to the greater New Orleans metropolitan area, at full Federal expense, by restoring the surrounding wetlands through measures to begin to reverse wetland losses in areas affected by navigation, oil and gas, and other channels and through modification of the Caernarvon Freshwater Diversion structure or its operations; at least $495,300,000 shall be used consistent with the cost-sharing provisions under which the projects were originally constructed to raise levee heights where necessary and otherwise enhance the existing Lake Pontchartrain and Vicinity project and the existing West Bank and Vicinity project to provide the levels of protection necessary to achieve the certification required for participation in the National Flood Insurance Program under the base flood elevations current at the time of this construction: Provided, That the amount provided under this heading is designated as an emergency requirement pursuant to section 402 of H. Con. Res. 95 (109th Congress), the concurrent resolution on the budget for fiscal year 2006: Provided further, That $1,500,000 shall be for the North Padre Island, Texas project: Provided further, That $30,400,000 is available for flood control work in the Sacramento, California, Area: Provided further, That $2,000,000 shall be provided at full Federal expense for the Hawaii Water Systems Technical Assistance Program. OPERATIONS AND MAINTENANCE For an additional amount for “Operations and Maintenance” to dredge navigation channels and repair other Corps projects related to the consequences of Hurricane Katrina and other hurricanes of the 2005 season, $3,200,000 to remain available until expended: Provided, That the amount provided under this heading is designated as an emergency requirement pursuant to section 402 of H. Con. Res. 95 (109th Congress), the concurrent resolution on the budget for fiscal year 2006: Provided further, That the Secretary of the Army, acting through the Chief of Engineers, is directed to use funds appropriated herein for dredging needs along the Texas Gulf Coast. FLOOD CONTROL AND COASTAL EMERGENCIES (including rescission of funds) For an additional amount for “Flood Control and Coastal Emergencies”, as authorized by section 5 of the Act of August 18, 1941 (33 U.S.C. 701n), for necessary expenses relating to the consequences of Hurricane Katrina and other hurricanes, $3,145,024,000, to remain available until expended: Provided, That the Secretary of the Army is directed to use the funds appropriated under this heading to modify, at full Federal expense, authorized projects in southeast Louisiana to provide hurricane and storm damage reduction and flood damage reduction in the greater New Orleans and surrounding areas; $530,000,000 shall be used to 120 STAT. 455 modify the 17th Street, Orleans Avenue, and London Avenue drainage canals and install pumps and closure structures at or near the lakefront; $250,000,000 shall be used for storm-proofing interior pump stations to ensure the operability of the stations during hurricanes, storms, and high water events; $170,000,000 shall be used for armoring critical elements of the New Orleans hurricane and storm damage reduction system; $350,000,000 shall be used to improve protection at the Inner Harbor Navigation Canal; $215,000,000 shall be used to replace or modify certain non-Federal levees in Plaquemines Parish to incorporate the levees into the existing New Orleans to Venice hurricane protection project; $1,584,000,000 shall be used for reinforcing or replacing flood walls, as necessary, in the existing Lake Pontchartrain and Vicinity project and the existing West Bank and Vicinity project to improve the performance of the systems; $30,024,000 for repairs, replacements, modifications and improvements of non-Federal levees and associated protection measures in Terrebonne Parish at full Federal expense: Provided further, That $16,000,000 is provided for the restoration of funds for hurricane-damaged projects in the State of Pennsylvania: Provided further, That any project using funds appropriated under this heading shall be initiated only after non-Federal interests have entered into binding agreements with the Secretary requiring the non-Federal interests to pay 100 percent of the operation, maintenance, repair, replacement, and rehabilitation costs of the project and to hold and save the United States free from damages due to the construction or operation and maintenance of the project, except for damages due to the fault or negligence of the United States or its contractors: Provided further, That the amount provided under this heading is designated as an emergency requirement pursuant to section 402 of H. Con. Res. 95 (109th Congress), the concurrent resolution on the budget for fiscal year 2006. Of the funds provided under this heading in chapter 3 of division B of Public Law 109–148, $15,000,000 are rescinded.