Pub. L. 110-114, tit. III, sec. 3057

LITTLE WOOD RIVER, GOODING, IDAHO.

EnactedYear: 2007Length: 185 wordsOfficial source
SEC. 3057. LITTLE WOOD RIVER, GOODING, IDAHO.(a) In General.—The project for flood control, Gooding, Idaho, constructed under the emergency conservation work program established under the Act of March 31, 1933 (16 U.S.C. 585 et seq.), is modified—(1) to direct the Secretary to rehabilitate the Gooding Channel project for the purposes of flood control and ecosystem restoration if the Secretary determines that such rehabilitation is not required as a result of improper operation and maintenance of the project by the non-Federal interest and that the rehabilitation and ecosystem restoration is feasible; and(2) to direct the Secretary to plan, design, and construct the project at a total cost of $9,000,000.(b) Cost Sharing.—(1) In general.—Costs for reconstruction of a project under this section shall be shared by the Secretary and the non-Federal interest in the same percentages as the costs of construction of the original project were shared.(2) Operation, maintenance, and repair costs.—The costs of operation, maintenance, repair, and rehabilitation of a project carried out under this section shall be a non-Federal responsibility.(c) Economic Justification.—Reconstruction efforts and activities carried out under this section shall not require economic justification.
Pub. L. 110-114, tit. III, sec. 3057: LITTLE WOOD RIVER, GOODING, IDAHO. | Justis AI