Pub. L. 101-101, tit. I, sec. 104

Pub. L. 101-101, tit. I, sec. 104

EnactedYear: 1989Length: 112 wordsOfficial source
Sec. 104. The project for shoreline protection for the Atlantic Coast of Maryland (Ocean City), authorized by section 501(a) of the Water Resources Development Act of 1986 (Public Law 99–662; 100 Stat. 4135), is modified to authorize the Secretary to construct hurricane and storm protection measures based on the District Engineer’s Post Authorization Change Notification Report dated May 1989, at a total initial cost of $71,000,000, with an estimated Federal cost of $37,000,000 and an estimated non-Federal cost of $34,000,000, and an annual cost of $2,700,000 for periodic beach nourishment over the life of the project, with an estimated annual Federal cost of $1,755,000 and an estimated annual non-Federal cost of $945,000.