Pub. L. 110-422, tit. VI, subtit. B, sec. 611
SPACE SHUTTLE FLIGHT REQUIREMENTS.
SEC. 611. SPACE SHUTTLE FLIGHT REQUIREMENTS.(a) Report on U.S. Human Spaceflight Capabilities.—Section 501(c) of the National Aeronautics and Space Administration Authorization Act of 2005 (42 U.S.C. 16761(c)) is amended by striking the matter before paragraph (1) and inserting the following: “Not later than 90 days after the date of enactment of the National Aeronautics and Space Administration Authorization Act of 2008, the Administrator shall submit to the Committee on Commerce, Science, and Transportation of the Senate and the Committee on Science and Technology of the House of Representatives a report 122 STAT. 4797 on the lack of a United States human space flight system to replace the Space Shuttle upon its planned retirement, currently scheduled for 2010, and the ability of the United States to uphold the policy described in subsection (a), including a description of—”.(b) Baseline Manifest.—In addition to the Space Shuttle flights listed as part of the baseline flight manifest as of January 1, 2008, the Utilization flights ULF–4 and ULF–5 shall be considered part of the Space Shuttle baseline flight manifest and shall be flown prior to the retirement of the Space Shuttle, currently scheduled for 2010.(c) Additional Flight To Deliver the Alpha Magnetic Spectrometer and Other Scientific Equipment and Payloads to the International Space Station.—(1) In general.—In addition to the flying of the baseline manifest as described in subsection (b), the Administrator shall take all necessary steps to fly one additional Space Shuttle flight to deliver the Alpha Magnetic Spectrometer and other scientific equipment and payloads to the International Space Station prior to the retirement of the Space Shuttle. The purpose of the mission required to be planned under this subsection shall be to ensure the active use of the United States portion of the International Space Station as a National Laboratory by the delivery of the Alpha Magnetic Spectrometer, and to the extent practicable, the delivery of flight-ready research experiments prepared under the Memoranda of Understanding between NASA and other entities to facilitate the utilization of the International Space Station National Laboratory, as well as other fundamental and applied life sciences and other microgravity research experiments to the International Space Station as soon as the assembly of the International Space Station is completed.(2) Flight schedule.—If the Administrator, within 12 months before the scheduled date of the additional Space Shuttle flight authorized by paragraph (1), determines that—(A) NASA will be unable to meet that launch date before the end of calendar year 2010, unless the President decides to extend Shuttle operations beyond 2010, or (B) implementation of the additional flight requirement would, in and of itself, result in—(i) significant increased costs to NASA over the cost estimate of the additional flight as determined by the Independent Program Assessment Office, or(ii) unacceptable safety risks associated with making the flight before termination of the Space Shuttle program,the Administrator shall notify the Senate Committee on Commerce, Science, and Transportation and the House of Representatives Committee on Science and Technology of the determination, and provide a detailed explanation of the basis for that determination. After the notification is provided to the Committees, the Administrator shall remove the flight from the Space Shuttle schedule unless the Congress by law reauthorizes the flight or the President certifies that it is in the national interest to fly the mission.(d) Termination or Suspension of Activities That Would Preclude Continued Flight of Space Shuttle Prior To Review by the Incoming 2009 Presidential Administration.—122 STAT. 4798(1) In general.—The Administrator shall terminate or suspend any activity of the Agency that, if continued between the date of enactment of this Act and April 30, 2009, would preclude the continued safe and effective flight of the Space Shuttle after fiscal year 2010 if the President inaugurated on January 20, 2009, were to make a determination to delay the Space Shuttle’s scheduled retirement.(2) Report on impact of compliance.—Within 90 days after the date of enactment of this Act, the Administrator shall provide a report to the Congress describing the expected budgetary and programmatic impacts from compliance with paragraph (1). The report shall include—(A) a summary of the actions taken to ensure the option to continue space shuttle flights beyond the end of fiscal year 2010 is not precluded before April 30, 2009;(B) an estimate of additional costs incurred by each specific action identified in the summary provided under subparagraph (A);(C) a description of the proposed plan for allocating those costs among anticipated fiscal year 2009 appropriations or existing budget authority;(D) a description of any programmatic impacts within the Space Operations Mission Directorate that would result from reallocations of funds to meet the requirements of paragraph (1);(E) a description of any additional authority needed to enable compliance with the requirements of paragraph (1); and(F) a description of any potential disruption to the timely progress of development milestones in the preparation of infrastructure or work-force requirements for shuttle follow-on launch systems.(e) Report on Impacts of Space Shuttle Extension.—Within 120 days after the date of enactment of this Act, the Administrator shall provide a report to the Congress outlining options, impacts, and associated costs of ensuring the safe and effective operation of the Space Shuttle at the minimum rate necessary to support International Space Station operations and resupply, including for both a near-term, 1-to-2 year extension of Space Shuttle operations and for a longer term, 3-to-6 year extension. The report shall include an assessment of—(1) annual fixed and marginal costs, including identification and cost impacts of options for cost-sharing with the Constellation program and including the impact of those cost-sharing options on the Constellation program;(2) the safety of continuing the use of the Space Shuttle beyond 2010, including a probability risk assessment of a catastrophic accident before completion of the extended Space Shuttle flight program, the underlying assumptions used in calculating that probability, and comparing the associated safety risks with those of other existing and planned human-rated launch systems, including the Soyuz and Constellation vehicles;(3) a description of the activities and an estimate of the associated costs that would be needed to maintain or improve Space Shuttle safety throughout the periods described in the first sentence of this subsection were the President inaugurated 122 STAT. 4799 on January 20, 2009, to extend Space Shuttle operations beyond 2010, the currently anticipated date of Space Shuttle retirement;(4) the impacts on facilities, workforce, and resources for the Constellation program and on the cost and schedule of that program;(5) assumptions regarding workforce, skill mix, launch and processing infrastructure, training, ground support, orbiter maintenance and vehicle utilization, and other relevant factors, as appropriate, used in deriving the cost and schedule estimates for the options studied;(6) the extent to which program management, processes, and workforce and contractor assignments can be integrated and streamlined for maximum efficiency to support continued shuttle flights while transitioning to the Constellation program, including identification of associated cost impacts on both the Space Shuttle and the Constellation program;(7) the impact of a Space Shuttle flight program extension on the United States’ dependence on Russia for International Space Station crew rescue services; and(8) the potential for enhancements of International Space Station research, logistics, and maintenance capabilities resulting from extended Shuttle flight operations and the costs associated with implementing any such enhancements.