Pub. L. 111-281, tit. IX, sec. 915
ASSESSMENT OF CERTAIN AIDS TO NAVIGATION AND TRAFFIC FLOW.
SEC. 915. ASSESSMENT OF CERTAIN AIDS TO NAVIGATION AND TRAFFIC FLOW.(a) Information on Usage.—Within 60 days after the date of enactment of this Act, the Commandant of the Coast Guard shall—(1) determine the types and numbers of vessels typically transiting or utilizing that portion of the Atlantic Intracoastal Waterway beginning at a point that is due East of the outlet of the Cutler Drain Canal C–100 in Dade County, Florida, and ending at the Dade County line, during a period of 30 days; and124 STAT. 3019(2) provide the information on usage compiled under this subsection to the Senate Committee on Commerce, Science, and Transportation and the House of Representatives Committee on Transportation and Infrastructure.(b) Assessment of Certain Aids to Navigation.—Within 90 days after the date of enactment of this Act, the Commandant of the Coast Guard shall—(1) review and assess the buoys, markers, and other aids to navigation in and along that portion of the Atlantic Intracoastal Waterway specified in subsection (a), to determine the adequacy and sufficiency of such aids, and the need to replace such aids, install additional aids, or both; and(2) submit a report on the assessment required by this section to the committees.(c) Submission of Plan.—Within 180 days after the date of enactment of this Act, the Commandant shall submit a plan to the committees to address the needs identified under subsection (b).