Pub. L. 111-383, div. A, tit. II, subtit. D, sec. 232
COST BENEFIT ANALYSIS OF FUTURE TANK-FIRED MUNITIONS.
SEC. 232. COST BENEFIT ANALYSIS OF FUTURE TANK-FIRED MUNITIONS.(a) Cost Benefit Analysis Required.—(1) In general.—The Secretary of the Army shall conduct a cost benefit analysis of future munitions to be fired from the M1 Abrams series main battle tank to determine the proper investment to be made in tank munitions, including beyond line of sight technology.(2) Elements.—The cost benefit analysis under paragraph (1) shall include—(A) the predicted operational performance of future tank-fired munitions, including those incorporating beyond line of sight technology, based on the relevant modeling and simulation of future combat scenarios of the Army, including a detailed analysis on the suitability of each munition to address the full spectrum of targets across the entire range of the tank (including close range, mid-range, long-range, and beyond line of sight);(B) a detailed assessment of the projected costs to develop and field each tank-fired munition included in the analysis, including those incorporating beyond line of sight technology; and(C) a comparative analysis of each tank-fired munition included in the analysis, including suitability to address known capability gaps and overmatch against known and projected threats.(3) Munitions included.—In conducting the cost benefit analysis under paragraph (1), the Secretary shall include, at a minimum, the Mid-Range Munition, the Advanced Kinetic Energy round, and the Advanced Multipurpose Program.(b) Briefing.—Not later than April 15, 2011, the Secretary shall provide a detailed briefing to the congressional defense committees on the cost benefit analysis conducted under subsection (a).