Pub. L. 110-114, tit. III, sec. 3179 (as amended)
CONTINUATION OF PROJECT AUTHORIZATIONS.
SEC. 3179. CONTINUATION OF PROJECT AUTHORIZATIONS.
(a) In General.—Notwithstanding section 1001(b)(2) of the Water Resources Development Act of 1986 (33 U.S.C. 579a(b)(2)), the following projects shall remain authorized to be carried out by the Secretary:
(1) The project for navigation, Sacramento Deep Water Ship Channel, California, authorized by section 202(a) of the Water Resources Development Act of 1986 (100 Stat. 4092).
(2) The project for flood control, Agana River, Guam, authorized by section 401(a) of the Water Resources Development Act of 1986 (100 Stat. 4127).
(3) The project for navigation, Baltimore Harbor and Channels, Maryland and Virginia, authorized by section 101 of the River and Harbor Act of 1970 (84 Stat. 1818).
(4) The project for navigation, Fall River Harbor, Massachusetts, authorized by section 101 of the River and Harbor Act of 1968 (82 Stat. 731); except that the authorized depth of that portion of the project extending riverward of the Charles M. Braga, Jr. Memorial Bridge, Fall River and Somerset, Massachusetts, shall not exceed 35 feet.
(5) The project for flood control, Ecorse Creek, Wayne County, Michigan, authorized by section 101(a)(14) of the Water Resources Development Act of 1990 (104 Stat. 4607).
(b) Limitation.—A project described in subsection (a) shall not be authorized for construction after the last day of the 5-year period beginning on the date of enactment of this Act, unless, during such period, funds have been obligated for the construction (including planning and design) of the project.