Pub. L. 113-291, div. A, tit. VIII, subtit. B, sec. 814 (as amended)

IMPROVEMENT IN DEFENSE DESIGN-BUILD CONSTRUCTION PROCESS.

Year: 2025Length: 118 wordsOfficial source
SEC. 814. IMPROVEMENT IN DEFENSE DESIGN-BUILD CONSTRUCTION PROCESS. Section 2305a of title 10, United States Code, is amended by striking the second sentence of subsection (d) and inserting the following: “If the contract value exceeds $4,000,000, the maximum number specified in the solicitation shall not exceed 5 unless the head of the contracting activity, delegable to a level no lower than the senior contracting official within the contracting activity, approves the contracting officer’s justification with respect to an individual solicitation that a number greater than 5 is in the Federal Government’s interest. The contracting officer shall provide written documentation of how a maximum number exceeding 5 is consistent with the purposes and objectives of the two-phase selection procedures.”.
Pub. L. 113-291, div. A, tit. VIII, subtit. B, sec. 814 (as amended): IMPROVEMENT IN DEFENSE DESIGN-BUILD CONSTRUCTION PROCESS. | Justis AI