Pub. L. 115-232, div. A, tit. III, subtit. B, sec. 319 (as amended)

CORE SAMPLING AT JOINT BASE SAN ANTONIO, TEXAS.

Year: 2025Length: 115 wordsOfficial source
SEC. 319. CORE SAMPLING AT JOINT BASE SAN ANTONIO, TEXAS. (a) Site Investigation Required.—The Secretary of the Air Force shall conduct a core sampling study along the proposed route of the W-6 wastewater treatment line on Air Force real property, in compliance with best engineering practices, to determine if any regulated or hazardous substances are present in the soil along the proposed route. (b) Report Required.—Not later than 15 months after the date of the enactment of this Act, the Secretary of the Air Force shall submit to the Committees on Armed Services of the Senate and the House of Representatives a report on the results of the core samples taken pursuant to subsection (a).
Pub. L. 115-232, div. A, tit. III, subtit. B, sec. 319 (as amended): CORE SAMPLING AT JOINT BASE SAN ANTONIO, TEXAS. | Justis AI