Pub. L. 115-91, div. A, tit. I, subtit. D, sec. 137 (as amended)
COST-BENEFIT ANALYSIS OF UPGRADES TO MQ-9 REAPER AIRCRAFT.
SEC. 137. COST-BENEFIT ANALYSIS OF UPGRADES TO MQ-9 REAPER AIRCRAFT.
(a) In General.—The Secretary of Defense, in consultation with the Secretary of the Air Force, shall conduct an analysis that compares the costs and benefits of the following:
(1) Upgrading fielded MQ-9 Reaper aircraft to a Block 5 configuration.
(2) Proceeding with the procurement of MQ-9B aircraft instead of upgrading fielded MQ-9 Reaper aircraft to a Block 5 configuration.
(b) Report Required.—
(1) In general.—Not later than 180 days after the date of the enactment of this Act, the Secretary of Defense shall submit to the congressional defense committees a report that includes the results of the cost-benefit analysis conducted under subsection (a).
(2) Form of report.—The report required by paragraph (1) shall be submitted in unclassified form, but may include a classified annex.