Pub. L. 104-303, tit. I, sec. 101 (as amended)
PROJECT AUTHORIZATIONS.
SEC. 101. PROJECT AUTHORIZATIONS.
(a)
* * *
(b) Projects Subject to Report.—The following projects for
water resources development and conservation and other purposes
are authorized to be carried out by the Secretary substantially
in accordance with the plans, and subject to the conditions, recommended
in a final report (or in the case of the project described
in paragraph (10), a Detailed Project Report) of the Corps of Engineers,
if the report is completed not later than December 31, 1996:
(1) Chignik alaska.—The project for navigation, Chignik,
Alaska, at a total cost of $10,365,000, with an estimated Federal
cost of $4,282,000 and an estimated non-Federal cost of
$6,083,000.
(2) Cook inlet, alaska.—The project for navigation, Cook
Inlet, Alaska, at a total cost of $5,700,000, with an estimated Federal cost of $3,700,000 and an estimated non-Federal cost
of $2,000,000.
(3) St. paul island harbor, st. paul, alaska.—The project
for navigation, St. Paul Harbor, St. Paul, Alaska, at a total
cost of $52,300,000, with an estimated Federal cost of
$45,558,000 and an estimated non-Federal cost of $6,742,000.
(4) Norco bluffs, riverside county, california.—The
project for bluff stabilization, Norco Bluffs, Riverside County,
California, at a total cost of $8,600,000, with an estimated
Federal cost of $6,450,000 and an estimated non-Federal cost
of $2,150,000.
(5) Terminus dam, kaweah river, california.—The project for flood control and water supply, Terminus Dam,
Kaweah River, California, at a total cost of $34,500,000, with
an estimated Federal cost of $20,200,000 and an estimated
non-Federal cost of $14,300,000.
(6) Rehoboth beach and dewey beach, delaware.—The
project for storm damage reduction and shoreline protection,
Rehoboth Beach and Dewey Beach, Delaware, at a total cost
of $9,423,000, with an estimated Federal cost of $6,125,000
and an estimated non-Federal cost of $3,298,000, and an estimated
average annual cost of $282,000 for periodic nourishment
over the 50-year life of the project, with an estimated annual
Federal cost of $183,000 and an estimated annual non-Federal
cost of $99,000.
(7) Brevard county, florida.—The project for shoreline protection, Brevard County, Florida, at a total cost of
76,620,000, with an estimated Federal cost of $36,006,000
and an estimated non-Federal cost of $40,614,000, and an estimated
average annual cost of $2,341,000 for periodic nourishment
over the 50-year life of the project, with an estimated
annual Federal cost of $1,109,000 and an estimated annual
non-Federal cost of $1,232,000.
(8) Lake worth inlet, florida.—The ~project for navigation
and shoreline protection, Lake Worth Inlet, Palm Beach
Harbor, Florida, at a total cost of $3,915,000.
(9) Miami harbor channel, florida.—The project for
navigation, Miami Harbor Channel, Miami, Florida, at a total
cost of $3,221,000, with an estimated Federal cost of $1,800,000
and an estimated non-Federal cost of $1,421,000.
(10) New harmony, indiana.—The project for streambank
erosion protection, Wabash River at New Harmony, Indiana,
at a total cost of $2,800,000, with an estimated Federal cost
of $2,100,000 and an estimated non-Federal cost of $700,000.
(11) Westwego to harvey canal, louisiana.—The project
for hurricane damage prevention and flood control, West Bank
Hurricane Protection (Lake Cataouatche Area), Jefferson Parish,
Louisiana, at a total cost of $14,375,000, with an estimated
Federal cost of $9,344,000 and an estimated non-Federal cost
of $5,031,000.
(12) Chesapeake and delaware canal, maryland and
delaware.—The project for navigation and safety improvements,
Chesapeake and Delaware Canal, Baltimore Harbor
Connecting Channels, Delaware and Maryland, at a total cost
of $82,800,000, with an estimated Federal cost of $29,852,000
and an estimated non-Federal cost of $28,948,000.
(13) Absecon island, new jersey.—The project for storm
damage reduction and shoreline protection, Brigantine Inlet
to Great Egg Harbor Inlet, Absecon Island, New Jersey, at
a total cost of $52,000,000, with an estimated Federal cost
of $34,000,000 and an estimated non-Federal cost of
$18,000,000.
* * * * * * *