Pub. L. 118-159, div. B, tit. XXIV, sec. 2409 (as amended)
EXTENSION OF AUTHORITY TO CARRY OUT CERTAIN FISCAL YEAR 2022 PROJECTS.
SEC. 2409. EXTENSION OF AUTHORITY TO CARRY OUT CERTAIN FISCAL YEAR 2022 PROJECTS.
(a) Extension.—Notwithstanding section 2002 of the Military Construction Authorization Act for Fiscal Year 2022 (division B of Public Law 117–81; 135 Stat. 2161), the authorizations set forth in the table in subsection (b), as provided in sections 2401 and 2402 of that Act (135 Stat. 2173, 2174), shall remain in effect until October 1, 2025, or the date of the enactment of an Act authorizing funds for military construction for fiscal year 2026, whichever is later.
(b) Table.—The table referred to in subsection (a) is as follows:
Defense Agencies and ERCIP Projects: Extension of 2022 Project Authorizations
State/Country
Installation or Location
Project
Original Authorized Amount
AlabamaFort Novosel10 MW RICE Generator Plant and Microgrid Controls$24,000,000CaliforniaMarine Corps Air Station MiramarAdditional LFG Power Meter Station$4,054,000
Naval Air Weapons Station China Lake-RidgecrestSolar Energy Storage System$9,120,000GeorgiaFort Moore4.8 MW Generation and Microgrid$17,593,000
Fort Stewart10 MW Generation Plant, with Microgrid Control$22,000,000GuamPolaris Point Submarine BaseInner Apra Harbor Resiliency Upgrades Ph 1.$38,300,000MichiganCamp Grayling650 KW Gas-Fired Micro-Turbine Generation System$5,700,000MississippiCamp Shelby10 MW Generation Plant an Feeder level Microgrid System$34,500,000
Camp ShelbyElectrical Distribution Infrastructure Undergrounding Hardening Project$11,155,000New YorkFort DrumWellfield Field Expansion Project$27,000,000North CarolinaFort Liberty10 MW Microgrid Utilizing Existing and New Generators$19,464,000
Fort LibertyEmergency Water System$7,705,000OhioSpringfield-Beckley Municipal AirportBase-Wide Microgrid With Natural Gas Generator, Photovoltaic and Battery Storage$4,700,000Puerto RicoAguadillaMicrogrid Control System, 460 KW PV, 275 KW Generator, 660 Kwh Bess$10,120,000
Fort AllenMicrogrid Control System, 690 KW PV, 275 KW Gen, 570 Kwh Bess$12,190,000TennesseeMemphis International AirportPV Arrays and Battery Storage$4,780,000United KingdomRoyal Air Force LakenheathHospital Replacement-Temporary Facilities$19,283,000VirginiaNational Geospatial-Intelligence Agency Campus EastElectrical System Redundancy$5,299,000
- Public laws referenced