Pub. L. 118-159, div. C, tit. XXXI, subtit. C, sec. 3121 (as amended)
MODIFICATION TO AND TERMINATION OF CERTAIN REPORTING REQUIREMENTS UNDER ATOMIC ENERGY DEFENSE ACT.
SEC. 3121. MODIFICATION TO AND TERMINATION OF CERTAIN REPORTING REQUIREMENTS UNDER ATOMIC ENERGY DEFENSE ACT.
(a) Plan for Construction and Operation of MOX Facility.—Section 4306 of the Atomic Energy Defense Act (50 U.S.C. 2566(a)(3)) is amended in subsection (a)(3)(A) by striking “for as long as the MOX facility is in use” and inserting “through 2024”.
(b) Planned Disposition Program.—Such section is further amended in subsection (e) by striking “If on July 1 each year beginning in 2025 and continuing for as long as the MOX facility is in use, less than 34 metric tons of defense plutonium or defense plutonium materials have been processed by the MOX facility, the Secretary shall submit to Congress a plan for—” and inserting “If less than 34 metric tons of defense plutonium or defense plutonium materials have been processed by the MOX facility by October 1, 2026, the Secretary shall, not later than December 1, 2026, and on a biennial basis thereafter, submit to Congress a plan for—”.