Pub. L. 118-31, div. A, tit. XVI, subtit. C, sec. 1644 (as amended)

OPERATIONAL TIMELINE FOR STRATEGIC AUTOMATED COMMAND AND CONTROL SYSTEM.

Year: 2025Length: 165 wordsOfficial source
SEC. 1644. OPERATIONAL TIMELINE FOR STRATEGIC AUTOMATED COMMAND AND CONTROL SYSTEM. (a) In General.—The Secretary of the Air Force shall develop a replacement of the Strategic Automated Command and Control System (SACCS) by not later than the date on which the LGM-35A Sentinel intercontinental ballistic missile program reaches initial operational capability. (b) Replacement Capabilities.—The replacement required by subsection (a) shall— (1) replace the SACCS base processors; (2) replace the SACCS processors at launch control centers; (3) provide internet protocol connectivity for wing-wide command centers of the LGM-35A Sentinel intercontinental ballistic missile program; and (4) include such other capabilities necessary to address the evolving requirements of the LGM-35A Sentinel intercontinental ballistic missile program as the Secretary considers appropriate. (c) Periodic Updates.—Beginning not later than March 1, 2025, and not later than each of March 1 and September 1 annually thereafter, the Secretary of the Air Force shall provide to the congressional defense committees a briefing on the progress of the modernization effort described in subsection (a).
Pub. L. 118-31, div. A, tit. XVI, subtit. C, sec. 1644 (as amended): OPERATIONAL TIMELINE FOR STRATEGIC AUTOMATED COMMAND AND CONTROL SYSTEM. | Justis AI