40A-44.411, F.A.C.

40A-44.411. Completion Report

Last amended: 2013Year: 2026Length: 189 wordsOfficial source

Cite as Fla. Admin. Code r. 40A-44.411

Within 30 days after the completion of construction or alteration of any project for which a permit was granted under this chapter, the permittee shall file with the District a completion report prepared and certified in accordance with the certification requirements of subsection 40A-44.301(7), F.A.C. (1) The “As-Built Certification and Completion Report” Form Nos. A44-B or A44-C amended 7-1-92, which are hereby incorporated by reference, shall identify the permit number and shall certify that the project was completed according to the specifications and standards identified in the application and all conditions stipulated by the District. Copies can be obtained by contacting the District, or online at http://www.flrules.org/Gateway/Reference.asp?No=Ref-02965 or http://www.flrules.org/Gateway/Reference.asp?No=Ref-02966, or at the District’s website www.nwfwater.com. Any minor deviations not subject to the requirements of Rule 40A-44.331, F.A.C., for the permitted facility shall be identified in the report and shall be accompanied by supporting engineering documentation. (2) The project shall not be determined fully complete and shall not be used to impound or convey water until the required “As-Built Certification and Completion Report,” Form Nos. A44-B and A44-C, is submitted to, and verified by a final inspection by, the District.
40A-44.411, F.A.C.: 40A-44.411. Completion Report | Justis AI