40B-3.041, F.A.C.

40B-3.041. Permits Required

Last amended: 2026Year: 2026Length: 198 wordsOfficial source

Cite as Fla. Admin. Code r. 40B-3.041

(1) Unless expressly exempted in Rule 40B-3.051, F.A.C., a permit must be obtained from the District prior to the construction, repair, modification, or abandonment of any well within the District. (2) A permittee shall obtain a separate permit to abandon any failed attempt to construct a water well unless the drilling depth, casing depth, and location of the failed attempt are documented on the completion report of the completed well at the same permitted location. (3) A general permit is hereby granted for the construction, repair, modification, or abandonment of a piezometer, monitor well, or remediation well installed for investigation or rehabilitation at sites regulated by the Departmentโ€™s Division of Waste Management pursuant to Chapter 376, F.S., provided all of the following conditions are met: (a) The work is conducted by, or under the supervision of, a water well contractor; (b) The work complies with the construction and abandonment requirements of this Chapter; (c) The final water-bearing casing diameter is four inches or less; (d) The total borehole depth does not exceed 150 feet; and (e) The well is plugged by, or under the supervision of, a water well contractor upon completion of the site investigation or remediation.
40B-3.041, F.A.C.: 40B-3.041. Permits Required | Justis AI