40E-5.301, F.A.C.

40E-5.301. Conditions for Permit Issuance

Last amended: 2014Year: 2026Length: 158 wordsOfficial source

Cite as Fla. Admin. Code r. 40E-5.301

In order to obtain a permit, permit renewal, or permit modification pursuant to this chapter, an applicant must give reasonable assurances that the proposed diversion of water to be introduced into an aquifer and the impact of introducing and recovering the water from an aquifer: (1) Shall not violate the conditions of issuance in Rule 40E-2.301, F.A.C., with regard to the impacts associated with diverting source water for: (i) injection, (ii) storage, and (iii) recovery. (2) For artificial recharge systems that inject water sources not currently regulated under Chapter 40E-2, F.A.C. (e.g., use of reclaimed water), the system shall not cause water quality changes that would interfere with existing legal uses; (3) Satisfies the criteria contained in the โ€œApplicantโ€™s Handbook for Water Use Permit Applications within the South Florida Water Management District,โ€ incorporated by reference in Rule 40E-2.091, F.A.C.; and (4) Meets state water quality standards as demonstrated through the issuance of a permit under Chapter 62-528, F.A.C.
40E-5.301, F.A.C.: 40E-5.301. Conditions for Permit Issuance | Justis AI