40E-63.106, F.A.C.

40E-63.106. Works of the District within the Everglades

Last amended: 2018Year: 2026Length: 105 wordsOfficial source

Cite as Fla. Admin. Code r. 40E-63.106

The Works of The District within the Everglades Agricultural Area Basin include: S-2, S-3, S-5A, S-6, S-7, S-8, S-150, G-88, G-136, G-200, G-344A, G-344B, G-344C, G-344D, G-349B, G-350B, G-357, G-404, G-410, G-402-A, G-402-B, G-402-C, G-402-D, G-605, G-606, Miami Canal, North New River Canal, Hillsboro Canal, C-51 (at both current and ultimate discharge locations into the Everglades Protection Area), and their open channel connections. The Works of the District and other structures which are or have been used for calculating compliance with the phosphorus load reduction objectives of the Everglades program are set forth in โ€œAppendix A3,โ€ which is incorporated by reference in Rule 40E-63.091, F.A.C.
40E-63.106, F.A.C.: 40E-63.106. Works of the District within the Everglades | Justis AI