HAR §19-170-164

HAR §19-170-164. preparation of the final map

Length: 250 wordsOfficial source

Cite as Haw. Code R. § 19-170-164

(B) In the case of a subdivision which does not involve construction or widening of streets or highways, or construction of utilities, including sewer and water mains, the subdivider, after obtaining tentative approval of the preliminary map, may prepare a final map of the proposed subdivision. Approval of the final map may be granted upon certification of the chief engineer and manager that, where required, an adequate deposit or deposits for installation of necessary service laterals have been made for water and sewer service connections. (C) Any proposed subdivision at the time tentative approval of the preliminary map is granted, shall be required to conform to any changes or amendments to this subchapter or other applicable laws, rules, standards, and policies in effect at the time. New or amended standards shall be required to be met as a condition of permitting an extension of time. (2) Disapproval by the executive officer means the preliminary map does not conform to all or portions of the requirements of this subchapter. (3) Deferral by the executive officer means the preliminary map requires further consideration, study or consultation, or additional reports or data are required from the subdivider, or minor changes to the preliminary map are required. The deferral shall be for a period of ninety days. A request for an extension of the deferral may be made by the subdivider in writing to the executive officer stating the reasons therefor, prior to the expiration of the ninety-day period. One 180-day extension 170-91 3067
HAR §19-170-164: HAR §19-170-164. preparation of the final map | Justis AI