HAR §11-280.1-39
HAR §11-280.1-39. (Reserved)
Cite as Haw. Code R. § 11-280.1-39
SUBCHAPTER 4
RELEASE DETECTION
§11-280.1-40
General requirements for all UST
systems.
(a)
Owners and operators of UST systems
must provide a method, or combination of methods, of
release detection that:
(1)
Can detect a release from any portion of the
tank and the connected underground piping
that routinely contains product;
(2)
Utilizes equipment compatible with the
regulated substances being stored;
(3)
Is installed, calibrated, operated, and
maintained in accordance with the
manufacturer's instructions;
(4)
Is operated and maintained, and electronic
and mechanical components are tested for
proper operation, in accordance with one of
the following: manufacturer's instructions;
a code of practice developed by a nationally
recognized association or independent
testing laboratory; or requirements
determined by the department to be no less
protective of human health and the
environment than the requirements of
paragraphs (1) to (3).
All maintenance and
service of the release detection equipment
must be conducted by a technician with
280.1-47
§11-280.1-40
current certification or training
appropriate to the equipment serviced. A
test of the proper operation must be
performed at least every three hundred
sixty-five days, or in a time frame
recommended by the equipment manufacturer,
whichever is more frequent. Beginning July
15, 2019, as applicable to the facility, the
test must cover at a minimum the following
components and criteria:
(A)
Automatic tank gauge and other
controllers: test alarm; verify system
configuration; test battery backup;
(B)
Probes and sensors: inspect for
residual buildup; ensure floats move
freely; ensure shaft is not damaged;
ensure cables are free of kinks and
breaks; test alarm operability and
communication with controller;
(C)
Automatic line leak detector: test
operation to meet criteria in section
11-280.1-44(1) by simulating a leak;
(D)
Vacuum pumps and pressure gauges:
ensure proper communication with
sensors and controller; and
(E)
Hand-held electronic sampling equipment
associated with groundwater and vapor
monitoring: ensure proper operation;
and
(5)
Meets the performance requirements in
section 11-280.1-43 or 11-280.1-44,
as applicable, with any performance claims
and their manner of determination described
in writing by the equipment manufacturer or
installer. In addition, the methods listed
in section 11-280.1-43(2), (3), (4), (8),
(9), and (10) and section 11-280.1-44(1),
(2), and (4) must be capable of detecting
the leak rate or quantity specified for that
method in the corresponding section of the
rule with a probability of detection of 0.95
and a probability of false alarm of 0.05.
280.1-48
3 5 8 4
§11-280.1-41
(b)
When a release detection method operated in
accordance with the performance standards in section
11-280.1-43 or 11-280.1-44 indicates a release may
have occurred, owners and operators must notify the
department in accordance with subchapter 5.
(c)
Any UST system that cannot apply a method of
release detection that complies with the requirements
of this subchapter must complete the change-in-service
or closure procedures in subchapter 7.
[Eff 7/15/18;
comp 1/17/20; am and comp 7/8/21; comp MAR212025
]
(Auth:
HRS §§342L-3, 342L-32, 342L-33) (Imp:
HRS
§§342L-3, 342L-32, 342L-33)
§11-280.1-41
Requirements for petroleum UST
systems.
(a)
Tanks. Owners and operators of
petroleum UST systems must provide release detection
for tanks as follows:
(1)
Tanks that are neither part of an airport
hydrant fuel distribution system nor a UST
system with field-constructed tanks:
(A)
Tanks installed before August 9, 2013
must be monitored for releases at least
every thirty-one days using one of the
methods listed in section
11-280.1-43(4) to (9), except that:
(i)
UST systems that meet the
performance standards in section
11-280.1-20, and the monthly
inventory control requirements in
section 11-280.1-43(1) or (2), may
use tank tightness testing
(conducted in accordance with
section 11-280.1-43(3)) at least
every five years until ten years
after the tank was installed; and
(ii)
Tanks with capacity of 550 gallons
or less and tanks with a capacity
of 551 to 1,000 gallons that meet
the tank diameter criteria in
section 11-280.1-43(2) may use
280.1-49
§11-280.1-41
manual tank gauging (conducted in
accordance with section
11-280.1-43 (2)).
{B)
Not later than July 15, 2028, tanks
installed before August 9, 2013 must be
monitored for releases at least every
thirty-one days in accordance with
section 11-280.1-43(7).
(C)
Tanks installed on or after August 9,
2013 must be monitored for releases at
least every thirty-one days in
accordance with section 11-280.1-43(7).
(2)
Tanks that are part of an airport hydrant
fuel distribution system or a UST system
with field-constructed tanks, except field
constructed tanks with a capacity greater
than 50,000 gallons:
(A)
Tanks installed before July 15, 2018
must be monitored for releases at least
every thirty-one days using one of the
methods listed in section
11-280.1-43(4) to (9), except that:
(i)
UST systems that meet the
performance standards in section
11-280.1-20, and the monthly
inventory control requirements in
section 11-280.1-43(1) or (2), may
use tank tightness testing
(conducted in accordance with
section 11-280.1-43(3)) at least
every five years until ten years
after the tank was installed; and
(ii)
Tanks with capacity of 550 gallons
or less and tanks with a capacity
of 551 to 1,000 gallons that meet
the tank diameter criteria in
section 11-280.1-43(2) may use
manual tank gauging (conducted in
accordance with section
11-280.1-43 (2)).
(B)
Tanks installed on or after July 15,
2018 must be monitored for releases at
280.1-50
3 5 8 4
§11-280.1-41
least every thirty-one days in
accordance with section 11-280.1-43(7).
(3)
Field-constructed tanks with a capacity
greater than 50,000 gallons:
(b)
contains
releases
(1)
(A)
Tanks installed before July 15, 2018
must be monitored for releases at least
every thirty-one days using one of the
methods listed in section
11-280.1-43 (4),
(7),
(8), and (9) or
use one or a combination of the methods
of release detection listed in section
11-280.1-43(10).
(B)
Tanks installed on or after July 15,
2018 must be monitored for releases at
least every thirty-one days in
accordance with section 11-280.1-43(7).
Piping. Underground piping that routinely
regulated substances must be monitored for
as follows:
Piping installed before August 9, 2013, for
UST systems other than airport hydrant fuel
distribution systems and UST systems with
field-constructed tanks, must meet one of
the following:
(A)
Pressurized piping. Underground piping
that conveys regulated substances under
pressure must:
(i)
Be equipped with an automatic line
leak detector conducted in
accordance with section
11-280.1-44(1); and
(ii)
Have an annual line tightness test
conducted in accordance with
section 11-280.1-44(2) or have
monthly monitoring conducted in
accordance with section
11-280.1-44 (3).
(B)
Suction piping. Underground piping that
conveys regulated substances under
suction must:
(i)
Have a line tightness test
conducted at least every three
280.1-51
354
§11-280.1-41
years and in accordance with
section 11-280.1-44(2);
(ii)
Use a monthly monitoring method
conducted in accordance with
section 11-280.1-44(3); or
{iii)
Meet the standards in paragraph
(6)(A) to (E).
(2)
Not later than July 15, 2028, piping
installed before August 9, 2013, for UST
systems other than airport hydrant fuel
distribution systems and UST systems with
field-constructed tanks, must meet one of
the following:
(A)
Pressurized piping. Underground piping
that conveys regulated substances under
pressure must:
(i)
Be monitored for releases at least
every thirty-one days in
accordance with section
11-280.1-43(7); and
(ii)
Be equipped with an automatic line
leak detector in accordance with
section 11-280.1-44(1).
{B)
Suction piping. Underground piping that
conveys regulated substances under
suction must:
(i)
Be monitored for releases at least
every thirty-one days in
accordance with section
11-280.1-43(7); or
(ii)
Meet the standards in paragraph
(6) (A) to (E).
(3)
Piping installed on or after August 9, 2013,
for UST systems other than airport hydrant
fuel distribution systems and UST systems
with field-constructed tanks, must meet the
technical specifications in paragraph (2) {A)
or ( B) .
(4)
Piping for UST systems with field
constructed tanks with a capacity less than
or equal to 50,000 gallons and not part of
an airport hydrant fuel distribution system:
280.1-52
8 5 8 4
§11-280.1-41
(A)
Piping installed before July 15, 2018
must meet the technical specifications
in paragraph (1) (A) or (B).
(B)
Not later than July 15, 2038, piping
installed before July 15, 2018 must
meet the technical specifications in
paragraph (2) (A) or (B), unless an
alternative design is approved by the
director under section ll-280.l-21(c).
(C)
Piping installed on or after July 15,
2018 must meet the technical
specifications in paragraph (2) (A) or
( B) .
(5)
Piping for airport hydrant fuel distribution
systems and UST systems with field
constructed tanks with a capacity greater
than 50,000 gallons must meet one of the
following:
(A)
Pressurized piping. Underground piping
that conveys regulated substances under
pressure must:
(i)
Be equipped with an automatic line
leak detector conducted in
accordance with section
ll-280.l-44(1)and have an annual
line tightness test conducted in
accordance with section
11-280.1-44(2);
(ii)
Be equipped with an automatic line
leak detector conducted in
accordance with section
11-280.1-44(1) and have monthly
monitoring conducted in
accordance with any of the methods
in section 11-280.1-43(7) to (9)
designed to detect a release from
any portion of the underground
piping that routinely contains
regulated substances; or
(iii)
Use one or a combination of the
methods of release detection
listed in section 11-280.1-44(4).
280.1-53
3 5 8 4 ..
§11-280.1-41
(B)
Suction piping. Underground piping that
conveys regulated substances under
suction must:
(i)
Have a line tightness test
conducted at least every three
years and in accordance with
section 11-280.1-44(2);
(ii)
Use a monthly monitoring method
conducted in accordance with
section 11-280.1-43(7) to (9)
designed to detect a release from
any portion of the underground
piping that routinely contains
regulated substances;
(iii)
Use one or a combination of the
methods of release detection
listed in section 11-280.1-44(4);
or
(iv)
Meet the standards in paragraph
(6) (A) to (E).
(6)
No release detection is required for suction
piping that is designed and constructed to
meet the following standards:
(A)
The below-grade piping operates at less
than atmospheric pressure;
(B)
The below-grade piping is sloped so
that the contents of the pipe will
drain back into the storage tank if the
suction is released;
(Cl
Only one check valve is included in
each suction line;
(D)
The check valve is located directly
below and as close as practical to the
suction pump; and
(E)
A method is provided that allows
compliance with subparagraphs (B) to
( D) to be readily determined.
[ Eff
7/15/18; comp 1/17/20; am ind Îomp
7 /8 /21; am and comp
MAR 2 202:>
J
(Auth:
HRS §§342L-3, 342L-32, 342L-33)
(Imp:
HRS §§342L-3, 342L-32, 342L-33)
280.1-54
3 5 8 i