HAR §11-280.1-39

HAR §11-280.1-39. (Reserved)

Last amended: 2021Length: 1,736 wordsOfficial source

Cite as Haw. Code R. § 11-280.1-39

SUBCHAPTER 4 RELEASE DETECTION §11-280.1-40 General requirements for all UST systems. (a) Owners and operators of UST systems must provide a method, or combination of methods, of release detection that: (1) Can detect a release from any portion of the tank and the connected underground piping that routinely contains product; (2) Utilizes equipment compatible with the regulated substances being stored; (3) Is installed, calibrated, operated, and maintained in accordance with the manufacturer's instructions; (4) Is operated and maintained, and electronic and mechanical components are tested for proper operation, in accordance with one of the following: manufacturer's instructions; a code of practice developed by a nationally recognized association or independent testing laboratory; or requirements determined by the department to be no less protective of human health and the environment than the requirements of paragraphs (1) to (3). All maintenance and service of the release detection equipment must be conducted by a technician with 280.1-47 §11-280.1-40 current certification or training appropriate to the equipment serviced. A test of the proper operation must be performed at least every three hundred sixty-five days, or in a time frame recommended by the equipment manufacturer, whichever is more frequent. Beginning July 15, 2019, as applicable to the facility, the test must cover at a minimum the following components and criteria: (A) Automatic tank gauge and other controllers: test alarm; verify system configuration; test battery backup; (B) Probes and sensors: inspect for residual buildup; ensure floats move freely; ensure shaft is not damaged; ensure cables are free of kinks and breaks; test alarm operability and communication with controller; (C) Automatic line leak detector: test operation to meet criteria in section 11-280.1-44(1) by simulating a leak; (D) Vacuum pumps and pressure gauges: ensure proper communication with sensors and controller; and (E) Hand-held electronic sampling equipment associated with groundwater and vapor monitoring: ensure proper operation; and (5) Meets the performance requirements in section 11-280.1-43 or 11-280.1-44, as applicable, with any performance claims and their manner of determination described in writing by the equipment manufacturer or installer. In addition, the methods listed in section 11-280.1-43(2), (3), (4), (8), (9), and (10) and section 11-280.1-44(1), (2), and (4) must be capable of detecting the leak rate or quantity specified for that method in the corresponding section of the rule with a probability of detection of 0.95 and a probability of false alarm of 0.05. 280.1-48 3 5 8 4 §11-280.1-41 (b) When a release detection method operated in accordance with the performance standards in section 11-280.1-43 or 11-280.1-44 indicates a release may have occurred, owners and operators must notify the department in accordance with subchapter 5. (c) Any UST system that cannot apply a method of release detection that complies with the requirements of this subchapter must complete the change-in-service or closure procedures in subchapter 7. [Eff 7/15/18; comp 1/17/20; am and comp 7/8/21; comp MAR212025 ] (Auth: HRS §§342L-3, 342L-32, 342L-33) (Imp: HRS §§342L-3, 342L-32, 342L-33) §11-280.1-41 Requirements for petroleum UST systems. (a) Tanks. Owners and operators of petroleum UST systems must provide release detection for tanks as follows: (1) Tanks that are neither part of an airport hydrant fuel distribution system nor a UST system with field-constructed tanks: (A) Tanks installed before August 9, 2013 must be monitored for releases at least every thirty-one days using one of the methods listed in section 11-280.1-43(4) to (9), except that: (i) UST systems that meet the performance standards in section 11-280.1-20, and the monthly inventory control requirements in section 11-280.1-43(1) or (2), may use tank tightness testing (conducted in accordance with section 11-280.1-43(3)) at least every five years until ten years after the tank was installed; and (ii) Tanks with capacity of 550 gallons or less and tanks with a capacity of 551 to 1,000 gallons that meet the tank diameter criteria in section 11-280.1-43(2) may use 280.1-49 §11-280.1-41 manual tank gauging (conducted in accordance with section 11-280.1-43 (2)). {B) Not later than July 15, 2028, tanks installed before August 9, 2013 must be monitored for releases at least every thirty-one days in accordance with section 11-280.1-43(7). (C) Tanks installed on or after August 9, 2013 must be monitored for releases at least every thirty-one days in accordance with section 11-280.1-43(7). (2) Tanks that are part of an airport hydrant fuel distribution system or a UST system with field-constructed tanks, except field­ constructed tanks with a capacity greater than 50,000 gallons: (A) Tanks installed before July 15, 2018 must be monitored for releases at least every thirty-one days using one of the methods listed in section 11-280.1-43(4) to (9), except that: (i) UST systems that meet the performance standards in section 11-280.1-20, and the monthly inventory control requirements in section 11-280.1-43(1) or (2), may use tank tightness testing (conducted in accordance with section 11-280.1-43(3)) at least every five years until ten years after the tank was installed; and (ii) Tanks with capacity of 550 gallons or less and tanks with a capacity of 551 to 1,000 gallons that meet the tank diameter criteria in section 11-280.1-43(2) may use manual tank gauging (conducted in accordance with section 11-280.1-43 (2)). (B) Tanks installed on or after July 15, 2018 must be monitored for releases at 280.1-50 3 5 8 4 §11-280.1-41 least every thirty-one days in accordance with section 11-280.1-43(7). (3) Field-constructed tanks with a capacity greater than 50,000 gallons: (b) contains releases (1) (A) Tanks installed before July 15, 2018 must be monitored for releases at least every thirty-one days using one of the methods listed in section 11-280.1-43 (4), (7), (8), and (9) or use one or a combination of the methods of release detection listed in section 11-280.1-43(10). (B) Tanks installed on or after July 15, 2018 must be monitored for releases at least every thirty-one days in accordance with section 11-280.1-43(7). Piping. Underground piping that routinely regulated substances must be monitored for as follows: Piping installed before August 9, 2013, for UST systems other than airport hydrant fuel distribution systems and UST systems with field-constructed tanks, must meet one of the following: (A) Pressurized piping. Underground piping that conveys regulated substances under pressure must: (i) Be equipped with an automatic line leak detector conducted in accordance with section 11-280.1-44(1); and (ii) Have an annual line tightness test conducted in accordance with section 11-280.1-44(2) or have monthly monitoring conducted in accordance with section 11-280.1-44 (3). (B) Suction piping. Underground piping that conveys regulated substances under suction must: (i) Have a line tightness test conducted at least every three 280.1-51 354 §11-280.1-41 years and in accordance with section 11-280.1-44(2); (ii) Use a monthly monitoring method conducted in accordance with section 11-280.1-44(3); or {iii) Meet the standards in paragraph (6)(A) to (E). (2) Not later than July 15, 2028, piping installed before August 9, 2013, for UST systems other than airport hydrant fuel distribution systems and UST systems with field-constructed tanks, must meet one of the following: (A) Pressurized piping. Underground piping that conveys regulated substances under pressure must: (i) Be monitored for releases at least every thirty-one days in accordance with section 11-280.1-43(7); and (ii) Be equipped with an automatic line leak detector in accordance with section 11-280.1-44(1). {B) Suction piping. Underground piping that conveys regulated substances under suction must: (i) Be monitored for releases at least every thirty-one days in accordance with section 11-280.1-43(7); or (ii) Meet the standards in paragraph (6) (A) to (E). (3) Piping installed on or after August 9, 2013, for UST systems other than airport hydrant fuel distribution systems and UST systems with field-constructed tanks, must meet the technical specifications in paragraph (2) {A) or ( B) . (4) Piping for UST systems with field­ constructed tanks with a capacity less than or equal to 50,000 gallons and not part of an airport hydrant fuel distribution system: 280.1-52 8 5 8 4 §11-280.1-41 (A) Piping installed before July 15, 2018 must meet the technical specifications in paragraph (1) (A) or (B). (B) Not later than July 15, 2038, piping installed before July 15, 2018 must meet the technical specifications in paragraph (2) (A) or (B), unless an alternative design is approved by the director under section ll-280.l-21(c). (C) Piping installed on or after July 15, 2018 must meet the technical specifications in paragraph (2) (A) or ( B) . (5) Piping for airport hydrant fuel distribution systems and UST systems with field­ constructed tanks with a capacity greater than 50,000 gallons must meet one of the following: (A) Pressurized piping. Underground piping that conveys regulated substances under pressure must: (i) Be equipped with an automatic line leak detector conducted in accordance with section ll-280.l-44(1)and have an annual line tightness test conducted in accordance with section 11-280.1-44(2); (ii) Be equipped with an automatic line leak detector conducted in accordance with section 11-280.1-44(1) and have monthly monitoring conducted in accordance with any of the methods in section 11-280.1-43(7) to (9) designed to detect a release from any portion of the underground piping that routinely contains regulated substances; or (iii) Use one or a combination of the methods of release detection listed in section 11-280.1-44(4). 280.1-53 3 5 8 4 .. §11-280.1-41 (B) Suction piping. Underground piping that conveys regulated substances under suction must: (i) Have a line tightness test conducted at least every three years and in accordance with section 11-280.1-44(2); (ii) Use a monthly monitoring method conducted in accordance with section 11-280.1-43(7) to (9) designed to detect a release from any portion of the underground piping that routinely contains regulated substances; (iii) Use one or a combination of the methods of release detection listed in section 11-280.1-44(4); or (iv) Meet the standards in paragraph (6) (A) to (E). (6) No release detection is required for suction piping that is designed and constructed to meet the following standards: (A) The below-grade piping operates at less than atmospheric pressure; (B) The below-grade piping is sloped so that the contents of the pipe will drain back into the storage tank if the suction is released; (Cl Only one check valve is included in each suction line; (D) The check valve is located directly below and as close as practical to the suction pump; and (E) A method is provided that allows compliance with subparagraphs (B) to ( D) to be readily determined. [ Eff 7/15/18; comp 1/17/20; am ind Îomp 7 /8 /21; am and comp MAR 2 202:> J (Auth: HRS §§342L-3, 342L-32, 342L-33) (Imp: HRS §§342L-3, 342L-32, 342L-33) 280.1-54 3 5 8 i
HAR §11-280.1-39: HAR §11-280.1-39. (Reserved) | Justis AI