HAR §11-280.1-45

HAR §11-280.1-45. 11-280

Last amended: 2021Length: 228 wordsOfficial source

Cite as Haw. Code R. § 11-280.1-45

1-40(a) (4) must be maintained for three years. At a minimum, the results must list each component tested, indicate whether each component tested meets criteria in section 11-280.1-40(a) (4) or needs to have action taken, and describe any action taken to correct an issue; (B) The results of tank tightness testing conducted in accordance with section 11-280.1-43(3) must be retained until the next test is conducted; and (C) The results of tank tightness testing, line tightness testing, and vapor monitoring using a tracer compound placed in the tank system conducted in accordance with section 11-280.1-43(10) or section 11-280.1-44(4) must be retained until the next test is conducted; (3) All records that the equipment being utilized to monitor or maintain the UST system is designed to produce must be maintained for at least three years after the record is generated; and (4) Written documentation of all calibration, maintenance, and repair of release detection equipment permanently located on-site must be maintained for at least three years. Any schedules of required calibration and maintenance provided by the release detection equipment manufacturer must be retained for five years from the date of installation. [Eff 7/15/18; comp 1/17/20; am and comp 7/8/21; comp MAR212025 ] (Auth: HRS §§342L-3, 342L-7.5, 342L-33) (Imp: HRS §§342L-3, 342L-7.5, 342L-33) §11-280.1-46 Release detection--codes of practice. (a) The following code of practice may be 280.1-68 3 5 8 4
HAR §11-280.1-45: HAR §11-280.1-45. 11-280 | Justis AI