HAR §11-45-27
HAR §11-45-27. Assembly and transfer
Cite as Haw. Code R. § 11-45-27
(a) No radiation
machines shall be assembled or installed in a facility which does
not have a current license.
(b)
No source of radiation shall be transferred to a
facility which does not have a current license.
(c)
No person shall manufacture, sell, lease, transfer,
lend, assemble, or install one or more components of radiation
machines or the supplies used in connection with such machines
without having a current license. Radiation machines and supplies
when properly placed in operation and used shall meet the
requirements of this chapter.
(d)
Any person who sells, leases, transfers, lends,
disposes, assembles, or installs one or more components of
radiation machines in this State shall notify the department
within fifteen days of:
(1)
The name and address of persons who have received
these machines;
(2)
The manufacturer, model, and serial number of the
control assembly of each radiation machine
transferred; and
(3)
The date of transfer of one or more radiation machine
components.
(e)
The following items are exempt from the requirements
specified in subsection (d):
(1)
Reloaded or replacement tube housing assemblies that
are reinstalled in or newly assembled into an existing
x-ray system;
(2)
Certified accessory components that have been
identified as such to the U.S. Department of Health
and Human Services;
(3)
Repaired components, whether or not removed from the
system and reinstalled during the course of repair,
provided the original installation into the x-ray
system was reported; or
(4)
Components installed temporarily in an x-ray system in
place of components removed temporarily for repair,
provided the temporarily installed component is
identified by a tag or label bearing the following
information:
"Temporarily Installed Component
This certified component has been assembled,
installed, adjusted, and tested by me according
to the instructions provided by the
manufacturer.
§11-45-27
45-46
Signature
Company Name
Street Address, P.O. Box
City, State, Zip Code
Date of Installation"
The replacement of the temporarily installed component
by a component other than the component originally
removed for repair shall be reported as specified by
subsection (d).
(f)
In the case of diagnostic x-ray systems which contain
one or more certified components, a copy of the assembler's report
prepared in compliance with requirements of the federal diagnostic
x-ray standard, 21 C.F.R. §1020.30(d), shall be submitted to the
department within fifteen days following completion of the
assembly. Such report shall suffice in lieu of any other report
by the assembler. [Eff 11/12/99] (Auth: HRS §§321-10, 321-11,
321-71) (Imp: HRS §§321-1, 321-11(21), 321-71)