HAR §11-58.1-32
HAR §11-58.1-32. Recycling and materials recovery facilities
Length: 587 wordsOfficial source
Cite as Haw. Code R. § 11-58.1-32
(a)
Applicability.
This Subpart regulates the construction
.
and operation of recyclables handling and recovery facilities
including but not limited to the following:
(1)
Recycling centers which process only source separated
materials such as batteries, motor oil, and metal
sludges.
(2)
Recycling facilities which separate recyclables from
nonrecyclables on-site.
(3)
Recycling facilities which only collect, buy, broker,
bale, compact or shred recyclable materials.
(4)
Exemptions.
The following facilities are exempt from
regulation under this section.
(A)
Composting operations which separate or treat
greenwaste, sludge, or ash.
These are regulated
in sections 11-58.1-04 and 11-58.1-41.
(B)
Facilities which process hazardous or other
regulated wastes as determined by 40 CFR 261 and
the Clean Air Act and do not produce a recycled
material or solid waste requiring disposal.
(C)
Buy back and refillable container centers.
(D)
Recycling drop-off centers are permitted by rule
and are not subject to this subchapter.
(E)
Manufacturers that use clean, source separated
58.1-90
1717
(
§11-58.1-32
paper products, glass, and plastic as feedstock
for their manu~acturing process, and which as a
result of this process, produce an end-product for
resale.
(F)
Repair and re-sale of clean, source separated
clothing, residential and commercial furniture.
(5)
Recycling facilities which are in operation at the time
this subchapter becomes effective shall complete the
requirements for a permit within one year after the
effective date of these rules.
(b)
Permit requirements.
A permit is required to construct
and operate a facility used in the recovery, collection, storage,
or treatment of recyclable material.
The application shall
contain the following:
(1)
Site analysis.
A site analysis shall be submitted and
shall include at least a site plan, description of
siting of equipment and machinery, public access, and
turnaround areas.
The site analysis shall include
surrounding land uses and, where determined necessary
by the director, describe mitigative measures taken to
reduce the impact of the facility upon neighboring
properties.
(2) Design requirements.
(A)
Equipment.
A description of the overall operation
and a functional description of all processing
equipment to be used to load, bale, shred,
compact, or process recyclables and the personnel
trained to operate them.
(B)
Adequate drainage.
Adequate drainage to prevent
standing water and to control "run-on" and "run-
off" of rainwater shall be provided.
(C)
Nuisance, health, and safety control.
Design
methods to control litter, insects, odors, and
vectors.
Develop a fire plan to prevent and
minimize fire hazards.
The facility shall
maintain a neat and orderly appearance and must be
screened and buffered to minimize nuisances to
neighboring properties.
(3)
Operation plan.
An operation plan shall be submitted
to the director detailing the following:
58.1-91
1717 •
§11-58.1-32
(A)
Recoverable materials collected.
A description of
the recoverable materials proposed to be
collected, stored, treated, and/or disposed of at
the facility including the current management of
the recoverable materials.
(B)
A means of weighing or measuring all materials
accepted at the facility and a means of weighing
or measuring residue, bypass waste, and
recyclables recovered.
(C)
Residue disposal.
Intended disposal measures and
capacities for residue created or separated during
processing.
(4)
Closure plan.
As part of the application for a permit,
the owner and/or operator shall develop a closure plan
to ensure no adverse environmental impacts.
(c)
Reporting requirements.
An annual report shall be
submitted to the director not later than thirty days after June
30 of each year.
The report shall detail the volume in tons of
each recoverable material collected, processed, shipped, and
disposed of.
[Eff JAN 131994 ]
(Auth:
HRS §§342G-2, 342G-13,
342G-28, 342H-3, 342H-4)