HAR §11-62-23.1
HAR §11-62-23.1. Specific requirements for wastewater treatment works
Length: 811 wordsOfficial source
Cite as Haw. Code R. § 11-62-23.1
(a) In addition to the requirements of section 11-62-08(b), the following documents shall be submitted to the director prior to approval to construct the treatment works:
(1) A written declaration signed and dated by the engineer that the proposed treatment works was designed to meet all applicable
62-29
13176
§11-62-23.1
effluent requirements of sections 11-62-26 and 11-62-27; and
(2) Certification by the owner of a proposed treatment works that the treatment works shall be operated and maintained in accordance with all of the provisions of the operation and maintenance manual developed pursuant to subsection (d)(2). The owner shall certify that the operation and maintenance manual shall be available to the operator of the treatment works and shall further certify that, upon sale or transfer of ownership of the treatment works, the sale or transfer will include construction drawings, equipment manuals, operational data collected, and the appropriate transfer documents and provisions binding the new owner to the operation and maintenance manual.
(b) All treatment works shall be provided with a continuous effluent flow measuring device such that daily wastewater flow can be determined. For treatment works with design flows equal to or greater than 100,000 gallons per day, the continuous effluent flow measuring device shall include recording equipment to totalize or chart daily flows.
(c) Unless otherwise specified by the director, the following distance requirements apply to all treatment works:
(1) Treatment units, except as provided in paragraph (3), shall not be less than twenty-five feet from any property lines nor less than ten feet from any building and swimming pools;
(2) Disposal systems, excluding effluent irrigation systems, shall not be less than five feet from a property line nor less than five feet from any building; and
(3) Completely enclosed, locked, and ventilated equipment rooms used to house items such as blowers, motors, pumps, electrical controls, and chemical feeders shall not be less than
62-30
3176
11
§11-62-23.1
five feet from property lines or less than
ten feet from dwelling unit(s).
(d) No person shall operate a treatment works
unless the following documents are provided:
(1) A written declaration signed and dated by
the engineer responsible for the preparation of the
operation and maintenance manual for the treatment
works, that the operation and maintenance manual meets
paragraph (2) and that if the treatment works is
operated in accordance with the manual, all applicable
effluent requirements will be met; and
(2) An operation and maintenance manual prepared
by the engineer. The manual as a minimum,
shall provide the details on the following:
(A) Operation and maintenance instructions
for each pump station and treatment
unit or process under normal and
emergency conditions such as power
outage and equipment malfunction;
(B) Operation and maintenance instructions
for the disposal system including
procedures for purging or chemical
"shock loading" to prevent or eliminate
biological growth in the subsurface
disposal system;
(C) List of required sampling frequencies
and analyses to be conducted by the
operator;
(D) Troubleshooting, corrective, and
preventive measures to be taken to
maintain process control and treatment
performance;
(E) Start-up procedures;
(F) Applicable state effluent requirements;
(G) Instructions on wasting and disposal of
wastewater sludge;
(H) Manpower requirements needed to operate
and maintain the treatment works;
(I) List of critical parts of the treatment
works;
(J) "As-built" drawings of the treatment
works;
62-31
3176
§11-62-23.1
(K) List of required daily activities, checks, and observations;
(L) Logs or report forms for all operation and maintenance activities performed;
(M) Flow schematic diagrams with details of piping and valving;
(N) Plot plan of the treatment works and Project site including all collection lines and equipment;
(O) Details on all safety equipment at the treatment works site, any applicable spare parts, maintenance, and operation instructions; and
(P) Details on all monitoring equipment including spare parts, maintenance, and operating instructions.
(e) No person shall operate a treatment works until it has been inspected to the director's satisfaction and the director has authorized in writing the use of the treatment works.
(1) The owner's engineer shall inspect the treatment works and submit to the director a final inspection report stating whether the wastewater treatment works has been constructed according to the submitted plans approved by the director and identifying any discrepancies and their resolutions. Any discrepancy between the constructed treatment works and the approved plans is sufficient reason to withhold approval to operate the treatment works.
(2) Before operation of the treatment works, the owner shall resolve all discrepancies.
(3) Any changes to the approved plan shall be resubmitted to the director for approval before the final inspection.
(4) The inspection shall not be considered final until the constructed treatment works conforms to the approved plans.
(f) After the first year of operation, the owner's engineer shall submit to the director a written statement based on results of actual sampling and professional judgment of whether or not the
62-32
3176