HAR §12-110-50
HAR §12-110-50. Standards
Cite as Haw. Code R. § 12-110-50
(a) Incorporation of
federal standard. Title 29, Part 1926 of the Code of
Federal Regulations, 2017 Edition published as of
July 1, 2017, by the U.S. Government Printing Office,
U.S. Superintendent of Documents, Washington, DC
20402-0001, is made a part of this chapter except as
provided in subsections (b) through (e).
(b) State specific standards. The following
standards are in effect in addition to subsection (a).
Where standards on a particular item exist for both
subsection (a) and this subsection, the standards
contained in this subsection supersede the standards
in subsection (a).
(1) 29 C.F.R. §1926.32 is amended by adding the
following definitions:
"Barricades" means an obstruction to deter the
passage of persons or vehicles.
"Dwelling" means any building that contains one
or two dwelling units used, intended, or designed to
be built, used, rented, leased, let or hired out to be
occupied, or that are occupied for living purposes.
§12-110-50
110-13
"Dwelling unit" means a single unit providing
complete independent living facilities for one or more
persons, including permanent provisions for living,
sleeping, eating, cooking, and sanitation.
"Infeasible" means that it is impossible to
perform the work using all available means and methods
or that it is technologically impossible to use safety
equipment or safe practices.
"Residential construction" means construction
work on detached one- and two-family dwellings and
townhouses not more than three stories above grade
plane in height.
"Signals" are moving signs, provided by workers,
such as flaggers, or by devices, such as flashing
lights, to warn of possible or existing hazards.
"Signs" are the warnings of hazard, temporarily
or permanently affixed or placed, at locations where
hazards exist.
"Tags" are temporary signs, usually attached to
a piece of equipment or part of a structure, to warn
of existing or immediate hazards.
"Townhouse" means a single-family dwelling unit
constructed in a group of three or more attached units
in which each unit extends from foundation to roof.
(2) 29 C.F.R. §1926.200(g)(2) is amended to read
as follows:
All traffic control signs or devices used
for protection of construction workers shall
conform to Part VI of the Manual of Uniform
Traffic Control Devices (AMUTCD), Part VI of
the Manual on Uniform Traffic Control
Devices, Millennium Edition, December 2000,
FHWA, which is incorporated by reference.
The Director of the Federal Register
approves this incorporation by reference in
accordance with 5 U.S.C. 552(a) and 1 C.F.R.
part 51. You may obtain a copy of the
Millennium Edition from the following
organizations: American Traffic Safety
Services Association, 15 Riverside Parkway,
Suite 100, Fredericksburg, VA 22406-1022;
§12-110-50
110-14
Telephone: 1-800-231-3475; FAX: (540) 368-
1722; www.atssa.com; Institute of
Transportation Engineers, 1099 14th Street,
NW., Suite 300 West, Washington, DC 20005-
3438; FAX: (202) 289-7722; www.ite.org; and
American Association of State Highway and
Transportation Officials; www.aashto.org;
Telephone: 1-800-231-3475; FAX: 1-800-525-
5562. Electronic copies of the MUTCD 2000
are available for downloading at
ttp://mutcd.fhwa.dot.gov/knomillennium. The
document is available for inspection at the
OSHA Docket Office, Room N2625, U.S.
Department of Labor, 200 Constitution
Avenue, NW., Washington, DC 20210 or at the
Office of the Federal Register, 800 North
Capitol Street, NW., Suite 700, Washington,
DC.
(3) The following requirements are added to 29
C.F.R., Part 1926, Subpart R:
(A) Personnel employed in steel erection
shall always wear hard hats while on
the job site.
(B) Protective footwear as defined in ANSI
Z41-1999, shall always be worn while on
the job site.
(C) Gloves, special protective clothing,
respirators, and any other personal
protective equipment shall be worn as
necessary.
(D) There shall be maintained at the site a
record of the identity of the
Structural Engineer of Record (SER),
all qualified persons and their area of
expertise, and all competent persons
for the steel erection activity.
(E) All approvals, certifications,
authorizations, drawings, and plans
required by this chapter shall be
§12-110-50
110-15
maintained onsite until all steel
erection activity is completed.
(4) The following definitions in 29 C.F.R.
§1926.751 are amended to read as follows:
"Hole" means a gap or void more than two (2)
inches (5.1 cm) in its least dimension in a
floor, roof, or other walking/working
surface. Pre-engineered holes in cellular
decking (for wires, cables, etc.) are not
included in this definition. "Opening"
means a gap or void five (5) inches (12.7
cm) or more in its least dimension in a
floor, roof, or other walking/working
surface. For the purposes of this subpart,
skylights and smoke domes that do not meet
the strength requirements of 29 C.F.R.
§1926.754(e)(3) shall be regarded as
openings.
(5) C.F.R. §1926.752(a) is amended to read as
follows:
Approval to begin steel erection. Before
authorizing the commencement of steel
erection, the controlling contractor shall
ensure that there are steel erection
drawings that are structure specific and a
site-specific erection plan as required. In
addition, the steel erector is to be
provided with the following written
notifications, including the documentation
supporting the determinations:
(A)
The concrete in the footings, piers,
and walls and the mortar in the masonry
piers and walls has attained, on the
basis of an appropriate ASTM standard
test method of field-cured samples,
either seventy-five (75) percent of the
intended minimum compressive design
strength or sufficient strength to
support the loads imposed during steel
erection.
§12-110-50
110-16
(B)
Any repairs, replacements, and
modifications to the anchor bolts were
conducted in accordance with 29 C.F.R.
§1926.755(b).
(6) 29 C.F.R. §1926.752(b) is amended to read as
follows:
Commencement of steel erection. A steel
erection contractor shall not erect steel
unless it has received written notification
and documentation supporting the
determination that the concrete in the
footings, piers, and walls or the mortar in
the masonry piers and walls has attained,
based on an appropriate ASTM standard test
method of field-cured
samples, either seventy-five (75) percent of
the intended minimum compressive design
strength or sufficient strength to support
the loads imposed during steel erection.
(7) 29 C.F.R. §1926.752(d) is amended to read as
follows:
Pre-planning of overhead hoisting
operations. All hoisting operations in
steel erection shall be pre-planned by the
controlling contractor to ensure that the
requirements of 29 C.F.R. §1926.753(d) are
met.
(8) 29 C.F.R. §1926.752(e) is amended to read as
follows:
Site specific erection plan. Where
employers elect, due to conditions specific
to the site, to develop alternate means and
methods that provide employee protection in
accordance with 29 C.F.R. §1926.753(c)(5),
§1926.754(b)(1) and (2), §1926.756(a)(1),
§1926.756(b), §1926.757(a)(2),
§1926.757(a)(4), §1926.757(e)(4), or 12-110-
50(c), a site specific erection plan that
includes structure specific erection plans
§12-110-50
110-17
and drawings where applicable shall be
developed by a qualified person and be
available at the work site until all steel
erection activity is completed. Guidelines
for establishing a site specific erection
plan are contained in 29 C.F.R. 1926 Subpart
R Appendix A.
(9) 29 C.F.R. §1926.753(c)(1)(i) is amended to
read as follows:
Cranes being used in steel erection
activities shall be visually inspected prior
to each shift by a competent person; the
inspection shall include observation for
potential deficiencies that may occur during
operation. At a minimum this inspection
shall include the following:
(A) All control mechanisms for
maladjustments;
(B) Control and drive mechanism for
excessive wear of components and
contamination by lubricants, water, or
other foreign matter;
(C) Safety devices, including but not
limited to boom angle indicators, boom
stops, boom kick out devices, anti-two
block devices, and load moment
indicators where required;
(D) Air, hydraulic, and other pressurized
lines for deterioration or leakage,
particularly those that flex in normal
operation;
(E) Hooks and latches for deformation,
chemical damage, cracks, or wear;
(F) Wire rope reeving for compliance with
hoisting equipment manufacturer's
specifications;
(G) Electrical apparatus for
malfunctioning, signs of excessive
deterioration, dirt, or moisture
accumulation;
§12-110-50
110-18
(H) Hydraulic system for proper fluid
level;
(I) Tires for proper inflation and
condition;
(J) Ground conditions around the hoisting
equipment for proper support, including
ground settling under and around
outriggers, ground water accumulation,
or similar conditions;
(K) The hoisting equipment for level
position; and
(L) The hoisting equipment for level
position after each move and setup.
(10) 29 C.F.R. §1926.753(c)(1)(iv) is amended to
read as follows:
The operator shall be responsible for those
operations under the operator's direct
control. Whenever there is any doubt as to
safety, the operator shall have the
authority to stop and refuse to handle
loads, in accordance with section 12-57-
7(b), until safety has been assured.
(11) 29 C.F.R. §1926.753(c)(5)(i) is amended to
read as follows:
During the hoisting and placing of purlins
and single joists when the rigger, who shall
be a qualified rigger, has determined that
safety latched on hooks are a greater
hazard, or
(12) 29 C.F.R. §1926.753(d)(1) is amended to read
as follows:
Routes for suspended loads shall be pre-
planned by the controlling contractor to
ensure that no employee is required to work
directly below a suspended load except for:
(A) Employees engaged in the initial
connection of the steel; or
(B) Employees necessary for the hooking or
unhooking of the load.
§12-110-50
110-18
(13) 29 C.F.R. §1926.753(e)(2) is amended to read
as follows:
Components of the multiple lift rigging
assembly shall be specifically designed and
assembled with a maximum capacity for total
assembly and for each individual attachment
point. This capacity, certified by the
manufacturer or a qualified rigger, shall be
based on the manufacturer's specifications
with a five (5) to one (1) safety factor for
all components. The written certification
of the components of the multiple rigging
assembly by the manufacturer or qualified
rigger along with the documentation
supporting the certification shall be made
available at the site.
(14) 29 C.F.R. §1926.753(e)(4)(i) is amended to
read as follows:
The multiple lift rigging assembly shall be
rigged with members:
Attached at their center of gravity and
maintained level such as by the use of tag
lines.
(15) 29 C.F.R. §1926.754(b) is amended to read as
follows:
The following additional requirements shall
apply for multistory structures:
(A) The permanent floors shall be installed
as the erection of structural members
progresses, and there shall be not more
than eight stories between the erection
floor and the upper-most permanent
floor, except where the structural
integrity is maintained as a result of
the design and is included in the site-
specific erection plan.
(B) At no time shall there be more than
four (4) floors or forty-eight (48)
feet (14.6 m), whichever is less,
§12-110-50
110-19
of unfinished bolting or welding above
the foundation or uppermost permanently
secured floor, except where the
structural integrity is maintained as a
result of the design and is included in
the site-specific erection plan.
(C) A fully planked or decked floor or nets
shall be maintained within two stories
or thirty (30) feet (9.1 m), whichever
is less, directly under any erection
work being performed.
(16) 29 C.F.R. §1926.756(a)(1) is amended to read
as follows:
During the final placing of solid web
structural members, the load shall not be
released from the hoisting line until the
members are secured with at least two (2)
bolts per connection, of the same size and
strength as shown in the erection drawings,
drawn up wrench-tight or the equivalent as
specified by the project structural engineer
of record and contained in the site specific
erection plan, except as specified in 29
C.F.R. §1926.756(b).
(17) 29 C.F.R. §1926.756(b) is amended to read as
follows:
Diagonal bracing. Solid web structural
members used as diagonal bracing shall be
secured by at least one (1) bolt per
connection drawn up wrench-tight or the
equivalent as specified by the project
structural engineer of record and contained
in the site specific erection plan.
(18) The following requirement is added to 29
C.F.R. §1926.756(c):
If a seat or equivalent device is used, its
use and the connection method shall be
specified in the site-specific erection
plan.
§12-110-50
110-20
(19) 29 C.F.R. §1926.757(a)(2)(i)(D) is amended
to read as follows:
Be included in the structure specific
erection drawings and site-specific erection
plans.
(20) 29 C.F.R. §1926.757(a)(7) is amended to read
as follows:
No modification that affects the strength of
a steel joist or steel joist girder shall be
made without the written approval of the
project structural engineer of record.
(21) 29 C.F.R. §1926.757(d)(6)(i) is amended to
read as follows:
The bridging shall be indicated on the
structure specific erection drawing;
(22) 29 C.F.R. §1926.760 is amended to read as
follows:
(A)
General requirements.
(i)
Each employee including
connectors, engaged in a steel
erection activity who is on a
walking/working surface with an
unprotected side or edge ten (10)
feet (3.1 m) or more above a lower
level shall be protected from fall
hazards by guardrail systems,
safety net systems, personal fall
arrest systems, positioning device
systems or fall restraint systems.
(ii)
Perimeter safety cables. On
multi-story structures, perimeter
safety cables shall be installed
at the final interior and exterior
perimeters of the floors as soon
as the metal decking has been
installed. Perimeter safety cables
shall meet the criteria for
guardrail systems in 29 C.F.R.
1926 Subpart R Appendix G.
§12-110-50
110-21
(iii)
Employees performing leading edge
work in controlled decking zones
shall be protected from fall
hazards as provided in
subparagraph (B).
(B)
Controlled Decking Zone (CDZ). A
controlled decking zone may be
established where fall protection
systems as described in subparagraph
(A)(i) have been determined to be
infeasible. The burden of proving
infeasibility is that of the employer.
For each CDZ, the following shall
apply:
(i)
Leading edge work is being
performed at heights of ten (10)
feet (3.1 m) or more and up to
thirty (30) feet (9 m) above the
next lower level.
(ii)
The boundaries of a CDZ shall be
designated and clearly marked by
control lines or the equivalent.
(iii)
Control lines provide a visible,
tangible reference and constant
reminder to employees working in a
CDZ.
(iv)
A control line for a CDZ shall be
erected not less than six (6) feet
(1.8 m) nor more than ninety (90)
feet (27.4 m) from the leading
edge.
(v)
A control line for a CDZ shall not
be more than ninety (90) feet
(37.4 m) wide.
(vi)
Control lines shall extend along
the entire length on the
unprotected or leading edge and
are approximately parallel to the
unprotected or leading edge.
(vii)
Control lines consist of ropes,
wires, tapes, or equivalent
§12-110-50
110-22
materials, and supporting
structures such as guardrail
system, wall, stanchion, or other
suitable anchorage.
(viii)
Each line shall have a minimum
breaking strength of two hundred
(200) pounds [ninety (90)
kilograms].
(ix)
Each line shall be rigged and
supported in such a way that its
lowest point (including sag) is
not less than thirty-nine (39)
inches (1.0 m) from the
walking/working surface and its
highest point is not more than
forty-five (45) inches (1.3 m)
from the walking/working surface.
(x)
A painted line on the
walking/working surface is not
equivalent to control lines and
may not be used to demonstrate,
define, or mark the boundary of a
CDZ.
(xi)
A sign or other warning indicator
positioned at the entrance to a
CDZ is not an equivalent to
control lines and may not be used
in lieu of control lines or its
equivalent.
(xii)
Each employee working in a CDZ
shall have completed CDZ training
in accordance with C.F.R.
§1926.761.
(xiii)
Each employee working in a CDZ
shall have completed CDZ training
in accordance with 29 C.F.R.
§1926.761.
(xiv)
Unsecured decking in a CDZ shall
not exceed 3,000 square feet
(914.4 m2).
(xv)
Safety deck attachments (see
definitions) shall be performed in
§12-110-50
110-23
the CDZ from the leading edge back
to the control line and shall have
at least two attachments for each
metal decking panel.
(xvi)
Final deck attachments and
installation of shear connectors
shall not be performed in the CDZ.
(xvii)
A current and accurate list of
employees who are authorized to
work in the CDZ shall be
maintained at the site.
Authorized employees shall further
be separately identified such that
non-authorized access to the CDZ
can be immediately noted and
promptly addressed. Employees not
authorized to work in the CDZ
shall not be permitted to enter
the CDZ.
(C)
Criteria for fall protection equipment.
(i)
Guardrail systems, safety net
systems, personal fall arrest
systems, positioning device
systems, and their components shall
conform to the criteria in 29
C.F.R. §1926.502 (see 29 C.F.R.
1926 Subpart R Appendix G.
(ii)
Fall arrest system components
shall be used in fall restraint
systems and shall conform to the
criteria in 29 C.F.R. §1926.502
(see 29 C.F.R. 1926 Subpart R
Appendix G), except that the
anchorages for a fall restraint
system shall be capable of
supporting at least 3,000 lbs (4.5
kN) per employee attached. Either
body belts or body harnesses shall
be used in fall restraint systems.
(iii)
Perimeter safety cables shall meet
the criteria for guardrail systems
in 29 C.F.R. §1926.502 (see 29
§12-110-50
110-24
C.F.R. 1926 Subpart R Appendix G).
(D)
Custody of fall protection. Fall
protection and fall protection
components provided by the steel
erector shall not remain in the area
where steel erection activity has been
completed, unless responsibility has
been assumed by the controlling
contractor or its authorized
representative:
(i)
Has directed the steel erector to
leave the fall protection in
place; and
(ii)
Has inspected and accepted control
and responsibility of the fall
protection prior to authorizing
persons other than steel erectors
to work in the area.
(23) 29 C.F.R. §1926.761 is amended to read as
follows:
The following provisions are supplemental to
the requirements regarding the hazards
addressed in this chapter.
(A) Training personnel. Training required
by this section shall be provided by a
qualified person(s).
(B) Fall hazard training. The employer
shall train each employee exposed to a
fall hazard in accordance with the
requirements of this section. The
employer shall institute a training
program and ensure employee
participation in the program.
(i)
The recognition and identification
of fall hazards in the work area;
(ii)
The use and operation of the fall
protection systems to be used by
the employer and in the systems
that may be encountered on the
jobsite; e.g., guardrail systems
§12-110-50
110-25
(including perimeter safety cable
systems), personal fall arrest
systems, positioning device
systems, fall restraint systems,
safety net systems, and other
protection to be used;
(iii)
The correct procedures for
erecting, maintaining,
disassembling, and inspecting the
fall protection systems to be
used;
(iv)
The procedures to be followed to
prevent falls to lower levels and
through or into holes and openings
in walking/working surfaces and
walls; and
(v)
The fall protection requirements
of this chapter.
(C)
Falling object or falling or flying
load hazard training. The employer
shall provide a training program for
all employees exposed to falling object
or falling or flying load hazards or
both. The program shall include
training and instruction in the
following areas:
(i)
How to recognize falling/flying
objects hazards in the work area;
(ii)
The consequences, including the
likely injuries, from being hit or
struck by falling/flying objects
or loads;
(iii)
What means, methods, or protective
systems or combination will be
used to provide protection from
falling/flying objects or loads;
(iv)
The employees’ specific
responsibilities with respect to
identifying hazards, identifying
when protective systems have been
compromised, and what actions to
§12-110-50
110-26
take to assist in their own and
other employees’ safety.
(D) Reliance on a third party provider of
training. The employer may not rely on
a third party or former employer of
current employees unless the employer
has determined through testing and
evaluation of employees that the past
training has met the requirements of
this chapter. Generic training must be
supplemented with site-specific
information and an opportunity to
practice using the equipment that is
specific to the jobsite.
(E) Retraining. When the employer has
reason to believe that any affected
employee has already been trained does
not have the understanding and skill
required by this chapter, the employer
shall retrain or provide retraining or
additional training. Circumstances
where retraining or additional training
is required include, but are not
limited to, situations where:
(i)
Changes in the workplace render
previous training obsolete;
(ii)
Changes in the types of fall
protection systems or equipment
to be used render previous
training obsolete; or
(iii)
Inadequacies in an affected
employees knowledge or use of
fall protection systems, hazard
controls, or equipment to be used
indicate that the employee had
not retained the requisite
understanding or skill.
(F) Special training programs. In addition
to the training required in paragraphs
(1) and (2), the employer shall provide
§12-110-50
110-28
special training to employees engaged
in the following activities.
(i)
Multiple lift rigging procedure.
The employer shall ensure that
each employee who performs
multiple lift rigging has been
provided training in the nature
of the hazards associated with
multiple lifts, and the proper
procedures and equipment to
perform multiple lifts required
by 29 C.F.R. §1926.753(c).
(ii)
Connector procedures. The
employer shall ensure that each
connector has been provided
training in the nature of hazards
associated with connecting as
well as the establishment,
access, proper connecting
techniques, and work practices
required by 29 C.F.R.
§1926.756(c) and 12-110-50(p).
(iii)
Controlled Decking Zone
Procedures. Where CDZs are being
used, the employer shall assure
that each employee has been
(iv)
provided training in the nature
of the hazards of working within
a controlled decking zone as well
as the establishment, access,
(v)
proper installation techniques,
and work practices required by 29
C.F.R. §1926.754(c) and
§1926.760.
(G) Certification of training.
(i) The employer shall certify that
each affected employee has been
trained or evaluated and
determined to be trained as
required by this section.
(ii) The written certification record
shall contain the name or other
§12-110-50
110-29
unique identity of the employee
trained, the date(s) of the
training or the evaluation of
prior training, and the signature
of the person who conducted the
training or the signature of the
employer.
(iii) The latest training certification
shall be maintained and made
readily available to employees,
employee representatives and the
director.
(24) 29 C.F.R. §1926, Subpart R Appendix A,
subsection (a) is amended to read as
follows:
General. This appendix serves as a
guideline to assist employers who elect to
develop a site specific erection plan in
accordance with 29 C.F.R. §1926.752(c) with
alternate means and methods to provide
employee protection in accordance with 29
C.F.R. §1926.752(e), §1926.753(c)(5),
§1926.754(b)(1)&(2), §1926.756(a)(1),
§1926.756(b), §1926.757(a)(2),
§1926.757(a)(4), §1926.757(e)(4) and 12-110-
50(b)(16).
(25) 29 C.F.R. §1926.1427(a)(4) is amended to
read as follows:
Whenever operator qualification or
certification is required under 29 C.F.R.
§1926.1427, the employer must provide the
qualification or certification at no cost to
operators who are employed by the employer
on November 8, 2011.
(26) 29 C.F.R. §1926.1427 is amended by the
deletion of paragraphs (b), (c), and (d).
Operators in Hawaii are required to be
certified under the
requirements of chapter 12-48, Hawaii
Administrative Rules.
§12-110-50
110-30
(27) 29 C.F.R. §1926.1427(f) is amended to read
as follows with 29 C.F.R.
§1926.1427(f)(4)(i), (ii), and (iii)
deleted:
Continuous monitoring. The operator-in-
training must be monitored by the operator's
trainer at all times.
(28) 29 C.F.R. §1926.1427(k)(1) is amended to
read as follows:
The provisions of this section are
applicable November 8, 2011. Operators who
were not required to be certified under
chapter 48, Hawaii Administrative Rules, as
of May 18, 2011 must comply with subsection
(f) beginning November 9, 2012.
(29) 29 C.F.R. §1926.1427(k) is amended by the
deletion of subparagraph (k)(2).
(30) 29 C.F.R. §1926.1430 (c)(2) is amended to
read as follows:
Transitional Period. During the one year
phase in period for operator certification
or qualification, as provided in 29 C.F.R.
§1926.1427(k), employers must train each
operator which has not yet been certified or
qualified in the areas addressed in 29
C.F.R. §1926.1427(j)." [Eff 2/13/12; am
11/2/12; am and comp 10/27/18] (Auth HRS
§396-4) (Imp: HRS §396-4)
Historical Note: Section §12-110-50 is based
substantially upon Part 3. [Eff 2/26/93, am 11/5/93,
am 7/25/94, am 8/10/95, am 1/26/96, am 9/21/96, am
11/16/96, am 2/8/97, am 10/23/97, am 7/6/98, am
3/29/99, am 12/29/00, am 1/10/03, am 5/21/04, am
5/5/05, am 9/1/05, am 3/31/06, am 12/21/06, am
4/19/07, am 8/26/07, am 5/2/08, am 7/27/09; R 2/13/12;
am 10/27/18]