(a) At the request of a repair organization for boilers or pressure vessels, the department may conduct an inspection and review of the organization's quality control program and facilities. This inspection shall be for the purpose of renewal of authorization to use the National Board "R" symbol stamp. Such requests shall be submitted to the department at least six (6) months prior the expiration date. Initial quality control reviews shall be done by the National Board. If the chief boiler inspector or a deputy inspector is 220-24 3 5 5 9