(a) Once the detailed mitigation plans are carried out, a request for verification shall be submitted by the agency to the SHPD. This request shall document completion of the detailed mitigation plans' tasks--usually in the form of a completion report, with one copy submitted. For archaeological data recovery, a data recovery report that meets the minimum standards set forth in chapter 13-278 shall be submitted to SHPD for review and approval.
(b) If the SHPD disagrees that the work has been successfully completed, it shall send a letter noting uncompleted tasks or inadequately completed tasks within forty five days of receipt of the request. To proceed with the review process, the agency shall correct the problems, consulting with the SHPD as needed to resolve differences, and resubmit the completion report.
(c) If the SHPD agrees that the work has been successfully concluded, SHPD shall send a verification letter within forty five days and the historic preservation process is concluded.
(d) In cases involving preservation, archaeological data recovery, or architectural recordation, the agency has the option to request an accelerated, two step verification, understanding that construction projects often need to proceed rapidly and that a completion report is often finished months after fieldwork is completed.
(1) Step 1. The agency shall submit documentation to the SHPD indicating that data recovery fieldwork, architectural recordation, or interim protection measures for properties to be preserved have been successfully completed. The SHPD writes a
25.68
275-22
§13-275-9
letter within thirty days to the agency
agreeing and stating construction may
proceed, with the understanding that Step 2
must be completed to conclude the historic
preservation process. If the measures have
not been successfully completed, the SHPD
shall write a letter within thirty days to
the agency indicating what needs to be
completed. To proceed with the review
process, the agency shall correct the
problems, consulting with the SHPD as needed
to resolve differences, and resubmit the
documentation.
(2) Step 2. The agency shall submit to the SHPD
a completion report for the data recovery
work, architectural recordation, or final
preservation work. The SHPD shall write a
letter to the agency within thirty days
stating the completion report is acceptable
and that the historic preservation process is
concluded. If the completion report is not
acceptable, the SHPD shall write a letter
within thirty days to the agency indicating
needed changes. To proceed with the review
process, the agency shall correct the
problems, consulting with the SHPD as needed
to resolve differences, and resubmit the
completion report.
(e) In cases involving solely historic data
recovery or ethnographic documentation where no field
study of the historic property or properties is to
occur, the agency has the option to request an
accelerated verification process to proceed with the
construction project and to submit a completion report
at a later date, agreed upon with the SHPD. The agency
shall submit the request in writing to the SHPD with
reasons and with a date for submittal of the completion
report. If the SHPD agrees, it shall send a letter to
the agency within thirty days stating construction may
proceed, with the agreement that the report shall be
submitted to the SHPD by the agreed upon date and shall
then be reviewed in accordance with subsections 13-275-
9(a) through (c). If the SHPD does not agree with the
request, the SHPD shall write a letter within thirty
days to the agency indicating the SHPD's concerns. If
the agency wishes to proceed with the accelerated
verification process, the agency shall correct the
problems, consulting with the SHPD as needed to resolve
275-23