HAR §15-150-9

HAR §15-150-9. Filing requirements

Last amended: 2021Length: 247 wordsOfficial source

Cite as Haw. Code R. § 15-150-9

Before t he p r oposed development shall be accepted for approval consideration , any applicant shall f ile with the lead agency the following : (1) A comple ted application form that can be obtained from the lead agency ; (2 ) A tax map key identification of the property on which the appl icant p roposes its development; (3 ) A plot plan of t he property , dra wn to scal e ; (4) A written description of the proposed de ve lopment and a statement of objectives , 1 50- 12 §15-150-10 and an estimate of the valuation of the development ; (5) A written description of the affected environment that addresses the development's technical and environmental characteristics; (6) A shoreline certification if the parcel abuts the shoreline; provided that the lead agency may waive a shoreline certification requirement if: (A) The shoreline is fixed by an artificial structure or structures that have been approved by all appropriate government agencies and for which engineering drawings exist to locate the interface between the shoreline and the structure; or (B) The shoreline is fixed by natural stabilized geographic features such as cliffs and rock formations; and (7) Any other relevant plans or information pertinent to the analysis of the development required by the lead agency . [Eff 2/25/2000; am and comp 4/17/2009; comp 11/30/2012 ; am and comp OCT 2 1 2021 ] (Auth : HRS §206E-8 . 5) (Imp : HRS §§91-2 , 206E-8.5)