HAR §11-200.1-18
HAR §11-200.1-18. Preparation and contents of a draft environmental assessment
Length: 205 wordsOfficial source
Cite as Haw. Code R. § 11-200.1-18
(a) A proposing agency shall conduct, or an approving agency shall require an applicant to conduct, early consultation seeking, at the earliest practicable time, the advice and input of the county agency responsible for implementing the county's general plan for each county in which the proposed action is to occur, and consult with other agencies having jurisdiction or expertise as well as those citizen groups and individuals that the proposing agency or approving agency reasonably believes may be affected.
(b) The scope of the draft EA may vary with the scope of the proposed action and its impact, taking into consideration whether the action is a project or a program. Data and analyses in a draft EA shall be commensurate with the importance of the impact, and less important material may be summarized, consolidated, or simply referenced. A draft EA shall indicate at appropriate points in the text any underlying studies, reports, and other information obtained and considered in preparing the draft EA, including cost-benefit analyses and reports required under other legal authorities.
(c) The level of detail in a draft EA may be more broad for programs or components of a program for which site-specific impacts are not discernible, and shall be
200.1-27
3336