IDAPA 02.04.23.100

Permit Required

Last amended: 2024Year: 2026Length: 20 wordsOfficial source
No person shall construct or operate a CLTWF without first obtaining a permit to do so from the Director. (7-1-24)
IDAPA 02.04.23.100: Permit Required | Justis AI