IDAPA 02.04.30.260

Site Suitability Determination

Last amended: 2024Year: 2026Length: 100 wordsOfficial source
Within thirty (30) days of receiving a request for the formation of a CAFO site advisory team that includes the required elements of Section 67-6520E(2), Idaho Code, the team will develop and submit to the county a site suitability determination that contains: (7-1-24) 01. Risk Category. A determination of an environmental risk category: high, moderate; low; or insufficient information to make a determination; (7-1-24) 02. Description of Factors. A description of the factors that contribute to the environmental risks; (7-1-24) 03. Mitigation. Any possible mitigation of the environmental risks. (7-1-24) 261. -- 303. (RESERVED) SUBCHAPTER C – AGRICULTURE ODOR MANAGEMENT
IDAPA 02.04.30.260: Site Suitability Determination | Justis AI