IDAPA 37.03.03.035

Class V Injection Well Requirements

Last amended: 2025Year: 2026Length: 993 wordsOfficial source
01. Permit Required for Class V Deep Injection Wells. No person shall construct, modify, maintain, or use a Class V deep injection well unless a permit has been issued by the Director. An application for permit must be completed and filed with the director on a form approved by the department accompanied by a filing fee as specified in Section 42-3905(1), Idaho Code. Applications proposing to inject recycled water derived from municipal or industrial wastewater sources must also adhere to all applicable IDEQ rules and permitting requirements. (7-1-25) 02. Permit Requirements for Class V Shallow Injection Wells. No person shall construct, modify, maintain, or use a Class V shallow injection well to inject recycled water derived from municipal or industrial wastewater sources unless a permit has been issued by the Director. An application for permit must be completed and filed with the director on a form approved by the department accompanied by a filing fee as specified in Section 42- 3905(1), Idaho Code. An application for permit may be required for the construction, modification, or use of all other shallow injection wells if the Director determines that the injection could result in unreasonable contamination of a USDW or cause a violation of Ground Water Quality Standards that would affect a beneficial use. Applications proposing to inject recycled water derived from municipal or industrial wastewater sources must also adhere to all applicable IDEQ rules and permitting requirements. (7-1-25) 03. Application Information Required. An applicant must submit the following information to the Director for all injection wells to be authorized by permit, unless the Director determines that it is not needed in whole or in part, and issues a written waiver to the applicant: (7-1-25) a. Facility name and location; (7-1-25) b. Name, address and phone number of the well operator; (7-1-25) c. Class, subclass and function of the injection well (see Section 020); (7-1-25) d. Latitude/longitude or legal description of the well location to the nearest ten (10) acre tract; (7-1-25) e. Ownership of the well; (7-1-25) f. County in which the injection well is located; (7-1-25) g. Construction information for the well; (7-1-25) IDAHO ADMINISTRATIVE CODE IDAPA 37.03.03 – Rules & Minimum Standards Department of Water Resources for the Construction & Use of Injection Wells Section 035 Page 12 h. Describe the quality, composition, and quantity of the injected fluids; (7-1-25) i. Status of the well; (7-1-25) j. A topographic map or aerial photograph extending one (1) mile beyond property boundaries, depicting: (7-1-25) i. Location of the injection well and associated facilities described in the application; (7-1-25) ii. Locations of other injection wells; (7-1-25) iii. Approximate drainage area, if applicable; (7-1-25) iv. Hazardous waste facilities, if applicable; (7-1-25) v. All wells used to withdraw drinking water; (7-1-25) vi. All other wells, springs and surface waters. (7-1-25) k. Distance and direction to nearest domestic well; (7-1-25) l. Depth to ground water; and (7-1-25) m. Alternative methods of waste disposal. (7-1-25) 04. Additional Information. The Director may require an applicant to submit additional information to demonstrate that the proposed or existing injection well will not endanger a USDW. The Director will not complete the processing of an application for which additional information has been requested until such time as the additional information is supplied. The Director may return any incomplete application and will not process such application until such time as the application is received in complete form. Additional information may include, but is not limited to the following items: (7-1-25) a. A topographic map showing locations of the following within a two (2) mile radius of the injection well: (7-1-25) i. All wells producing water; (7-1-25) ii. All exploratory and test wells; (7-1-25) iii. All other injection wells; (7-1-25) iv. Surface waters (including man-made impoundments, canals and ditches); (7-1-25) v. Mines and quarries; (7-1-25) vi. Residences; (7-1-25) vii. Roads; (7-1-25) viii. Bedrock outcrops; and (7-1-25) ix. Faults and fractures. (7-1-25) b. Additional maps or aerial photographs of suitable scale to accurately depict the following: (7-1-25) i. Location and surface elevation of the injection well described in this permit; (7-1-25) IDAHO ADMINISTRATIVE CODE IDAPA 37.03.03 – Rules & Minimum Standards Department of Water Resources for the Construction & Use of Injection Wells Section 050 Page 13 ii. Location and identification of all facilities within the property boundaries; (7-1-25) iii. Locations of all wells penetrating the proposed injection zone or within a one-quarter (1/4) mile radius of the injection well; (7-1-25) iv. Maps and cross sections depicting all underground sources of drinking water to include vertical and lateral limits within a one-quarter (1/4) mile radius of the injection well, their position relative to the injection zone and the direction of water movement: local geologic structures; regional geologic setting. (7-1-25) c. A comprehensive report of the following information: (7-1-25) i. A tabulation of all wells penetrating the proposed injection zone, listing owner, lease holder and operator; well identification (permit) number; size, weight, depth and cementing data for all strings of casing; (7-1-25) ii. Description of the quality, composition, and quantity of fluids to be injected; (7-1-25) iii. Description of geologic, hydrogeologic, and geochemical conditions present in the injection zone and confining beds; methods for determining geochemical conditions must be approved by the Director; (7-1-25) iv. Engineering data for the proposed injection well; (7-1-25) v. Proposed operating pressure; (7-1-25) vi. A detailed evaluation of alternative disposal practices; (7-1-25) vii. A plan of corrective action for wells penetrating the zone of injection, but not properly sealed or decommissioned; and (7-1-25) viii. Contingency plans to cope with all shut-ins or well failures to prevent the migration of unacceptable fluids into underground sources of drinking waters. (7-1-25) d. Name, address and phone number of person(s) or firm(s) supplying the technical information and/ or designing the injection well; (7-1-25) e. Proof that the applicant is financially responsible, through a performance bond or other appropriate means, to decommission the injection well in a manner approved by the Director. (7-1-25) 036. -- 049. (RESERVED)
IDAPA 37.03.03.035: Class V Injection Well Requirements | Justis AI