IDAPA 39.04.01.706
Iaap Implementation Method
01. Project Prioritization. Each project gets a priority value based upon number of based aircraft, purpose of the project, component of the airport of the project, pavement condition index (number) of the project and age of the most recent plan. Determine the values for each of the above element and calculate the priority number of each project for future use. (7-1-24) 02. Selection of Eligible Projects. The FAA identifies the NPIAS airport projects. (7-1-24) 03. Selection Guidelines for Projects. A set of guidelines directs the selection and order of projects. These guidelines allow latitude in selection of projects to create a โlevel playing field.โ (7-1-24) 04. Appendix for Aeronautics Advisory Board and Idaho Transportation Board Approval.An annual appendix is compiled, for use by the AAB, to review and accept the program. Aeronautics presents it to the ITB for final review, approval, and funding. (7-1-24) 707. -- 999. (RESERVED)