IDAPA 58.01.01.301

Requirement To Obtain Tier I Operating Permit

Last amended: 2023Year: 2026Length: 260 wordsOfficial source
01. Prohibition. No owner or operator may operate any Tier I source without an effective Tier I operating permit. (3-28-23) PERMIT TO CONSTRUCT CATEGORY FEE General permit, no facility-specific requirements (Defined as a source category specific permit for which the Department has developed standard emission limitations, operating require- ments, monitoring and recordkeeping requirements, and that require minimal engineering analysis. General permit facilities may include portable concrete batch plants, portable hot-mix asphalt plants and portable rock crushing plants.) $500 New source or modification to existing source with increase of emissions of less than one (1) ton per year $1,000 New source or modification to existing source with increase of emissions of one (1) to less than ten (10) tons per year $2,500 New source or modification to existing source with increase of emissions of ten (10) to less than one hundred (100) tons per year $5,000 Nonmajor new source or modification to existing source with increase of emissions of one hundred (100) tons per year or more $7,500 New major facility or major modification $10,000 Permit modifications where no engineering analysis is required $250 Application submittals for exemption applicability determinations, typographical errors, and name and ownership changes as described in Subsections 224.01, 224.02, 224.03 $0.00 IDAHO ADMINISTRATIVE CODE IDAPA 58.01.01 Department of Environmental Quality Rules for the Control of Air Pollution in Idaho Section 302 Page 58 02. Exceptions. No Tier I operating permit is required if the owner or operator is in compliance with Sections 311 through 315 and the Department has not taken final action on the application. (3-28-23)
IDAPA 58.01.01.301: Requirement To Obtain Tier I Operating Permit | Justis AI