IDAPA 58.01.01.336
Tier I Operating Permits For Tier I Portable Sources
01. Portable Tier I Source Permit Issuance. (3-28-23) a. The Department may issue a single Tier I operating permit authorizing emissions from similar operations of a portable Tier I source by the owner or operator at multiple temporary locations. (3-28-23) b. The operation must be temporary and involve at least one (1) change of location for the portable Tier I source during the term of the Tier I operating permit. (3-28-23) 02. Phase II Sources. No Phase II source may be permitted as a portable Tier I source. (3-28-23) 03. Portable Tier I Source Permit Content. Tier I operating permits for portable Tier I sources will include the following: (3-28-23) a. Terms and conditions that will ensure compliance with all applicable requirements at all authorized locations; (3-28-23) b. Requirements that the owner or operator notify the Department at least ten (10) days in advance of each change in location in accordance with Section 500; and (3-28-23) c. All terms and conditions identified in Sections 322,325, and 332. (3-28-23) 337. -- 359. (RESERVED)