IDAPA 58.01.01.599

Gasoline Cargo Tanks

Last amended: 2023Year: 2026Length: 179 wordsOfficial source
01. Prohibitions. After a Stage 1 vapor collection system is installed and operating, owners or operators of gasoline cargo tanks that unload gasoline into an underground gasoline storage tank with a capacity of ten thousand (10,000) gallons or more, in Ada or Canyon Counties, must comply with Table 2 to 40 CFR Part 63, Subpart CCCCCC, incorporated by reference in Section 107. (3-28-23) 02. Recordkeeping and Reporting. (3-28-23) a. The owner or operator of the gasoline cargo tank subject to Section 599 must maintain records of all certification testing and repairs. The records must identify the gasoline cargo tank; the date of the test or repair; and if applicable, the type of repair and the date of retest. The records must be maintained in a legible, readily available condition for at least two (2) years after the date of testing or repair was completed and must be available for inspection by the Department upon request. (3-28-23) b. Copies of all tests required under Subsection 599.01 must be submitted to the Department within thirty (30) days of certification testing. (3-28-23)
IDAPA 58.01.01.599: Gasoline Cargo Tanks | Justis AI