IDAPA 58.01.03.011

Inspections

Last amended: 2025Year: 2026Length: 212 wordsOfficial source
01. One or More Inspections. The Director will require inspections necessary to determine compliance with any provision of these rules. (7-1-25) IDAHO ADMINISTRATIVE CODE IDAPA 58.01.03 – Individual/Subsurface Sewage Department of Environmental Quality Disposal & Cleaning of Septic Tanks Rules Section 012 Page 23 02. Duty to Uncover. The permittee must, at the request of the Director, uncover or make available for inspection any portion or component of a system under construction or covered or concealed in violation of these rules. (7-1-25) 03. Advance Notice by Permittee. If an inspection requires preparation, such as test hole excavation or partial construction of the system, the applicant or permittee must notify the Director at least forty-eight (48) hours in advance, excluding weekends and holidays. (7-1-25) 04. Substantiating Receipts and Delivery Slips. Upon the Director’s request, the permittee must provide copies of receipts, delivery slips, or other similar documents to substantiate the origin, quality, or quantity of materials used in constructing any system. (7-1-25) 05. Finalizing a Permit. No system may receive wastewater until the Director conducts a final installation inspection and completes as-built drawings and specifications depicting the actual installation. The Director will provide a copy of the final as-built drawing to the owner within thirty (30) days after completing the final inspection. (7-1-25)
IDAPA 58.01.03.011: Inspections | Justis AI