32 Ill. Adm. Code 505.2200
Inspection Certificates
Section 505
Section 505.2200 Inspection
Certificates
This Section is not intended to
be, in any way, inconsistent with the applicable regulations, rules and
requirements of the NRC. If a requirement of this Section as applied in any
situation is or would be inconsistent with the regulations, rules and requirements
of the NRC, the requirements of this Section shall not be applied. The Agency
will take action in regard to an Inspection Certificate only in accordance with
Section 505.80. The Agency shall issue Inspection Certificates for non-ISI
boilers and pressure vessels in accordance with this Section if the reports,
inspection criteria and plans required to be submitted by and identified in
Sections 505.110 and 505.2100 and this Section are submitted in accordance with
the frequencies specified in those Sections and are in compliance with this
Part.
a) The Agency shall issue one Inspection Certificate to each
non-ISI boiler and pressure vessel for a term equal to the frequency of
inspection of the non-ISI boiler or pressure vessel. The frequency and type of
inspection for each non-ISI boiler and pressure vessel shall be as follows:
1) Power boilers, high pressure water boilers and high
temperature water boilers shall be inspected annually, which shall be an
internal inspection where conditions permit. The boilers shall also be
inspected externally annually while under representative operating conditions,
if possible.
2) Low pressure steam boilers, hot water heating boilers and hot
water supply boilers shall be inspected every 2 years. The inspection shall be
internal and external, where conditions permit. An external inspection shall
be conducted under representative operating conditions at the request of the
Authorized Inspector.
3) Pressure vessels subject to internal corrosion shall be
inspected in accordance with subsection (a)(3)(A), unless the Agency approves
an alternative under subsection (a)(3)(B).
A) Pressure vessels shall be inspected every 3 years. The
inspection shall be internal and external where conditions permit.
B) Alternatively, for each pressure vessel that can be inspected
only during refueling outages, the owner may develop an inspection plan for the
remaining life of the pressure vessel. The plan shall provide that an
inspection of each pressure vessel will occur prior to the completion of every
2 consecutive refueling outages, but in no case more than 5 years after the
last inspection of the pressure vessel. The owner may include in the plan
contingency options for conducting inspections during unplanned or extended
refueling outages, provided the required frequency of inspection is met. The
bases for the inspection plan may include, but is not necessarily limited to,
alternative examinations and tests planned and performed, past performance of
this and similar pressure vessels, status of the pressure vessel in the plant's
maintenance program, the environment and contents of the pressure vessel,
vessel use, service condition (operating or not) of the pressure vessel
relative to operation of the plant, corrosive environment where the pressure
vessel is installed, risks, methods of inspection, ALARA (as defined in 32 Ill.
Adm. Code 310) considerations, trade-offs and relevant engineering data. This
plan shall be submitted to the Agency for approval.
4) Pressure vessels not subject to internal corrosion shall be
inspected in accordance with subsection (a)(4)(A) or (B) as applicable, unless
the Agency approves an alternative under subsection (a)(4)(C):
A) Vessels containing incompressible fluids (e.g., water) shall be
inspected externally every 5 years.
B) Vessels containing compressible fluids (e.g., air steam), or a
combination of compressible and incompressible fluids, shall be inspected
externally every 3 years.
C) Alternatively, the owner may develop an inspection plan for the
vessel for its remaining life based upon refueling outages. This plan shall be
submitted to the Agency for approval. The basis for such an inspection plan
may include alternative examinations and tests planned and performed, past
performance of the pressure vessel and similar pressure vessels, status of the
pressure vessel in the plant's maintenance program, the environment and
contents of the pressure vessel and relevant engineering data.
AGENCY NOTE:
External inspection may be waived by the Agency due to inaccessibility of the
equipment, based on the owner's detailed assessment of documentation and
performance data verifying vessel integrity.
5) Inspection of flame safeguard equipment shall be to the
standards of Section 505.40(c) and will be in conjunction with the regular
inspection of boilers.
6) A grace period of 2 months beyond the period specified in
subsection (a)(1) or (2), may elapse between internal inspections of the boiler
while it is not under pressure and the external inspection of the boiler while
it is under pressure.
b) The Agency shall issue an initial Inspection Certificate for a
non-ISI boiler or pressure vessel in accordance with this subsection (b).
Owners of a non-ISI boiler or pressure vessel not yet in operation shall, prior
to operation of the boiler or pressure vessel, have a valid Inspection
Certificate issued by the Agency. Application for an Inspection Certificate
shall be in accordance with subsection (f) except that the owner shall submit
the documents listed in subsection (f)(2) at least 90 days prior to operating
the boiler or pressure vessel.
c) For other than initial issuance of an Inspection Certificate
in accordance with subsection (b), the Agency shall issue an Inspection
Certificate for each non-ISI boiler or pressure vessel at the nuclear facility
in accordance with this Section when the Agency determines that:
1) The inspections required under subsection (a) were applied to
the non-ISI boiler or pressure vessel, were completed and the condition of the
non-ISI boiler or pressure vessel is such that an Inspection Certificate may be
issued in accordance with subsection (d);
2) The Report of Inspection or similar report form was completed
for the non-ISI boiler or pressure vessel and was submitted to the Agency in
accordance with subsection (f)(2); and
3) If applicable, all submittals in subsections (e) and (f)(2)(B)
are met.
d) The Agency shall issue the Inspection Certificate within 90
days following receipt of the Report of Inspection on the non-ISI boiler or
pressure vessel, or shall observe the procedures of subsection (g). The latter
shall occur either within 90 days following receipt of the Report of Inspection
or within 10 days following the expiration date of the Inspection Certificate.
e) The Inspection Certificate issued for the non-ISI boiler or
pressure vessel as established by this Section may be extended for a maximum of
1 year.
1) For all pressure vessels and for boilers, other than power
boilers, high pressure water boilers and high temperature water boilers, the
owner shall request permission from the Agency to extend the term of the
Inspection Certificate prior to implementing the extension. The Agency shall
review a request for extension and permit the extension when the extension does
not increase the risk to the health and safety of the public and personnel.
2) For power boilers, high pressure water boilers and high
temperature water boilers, the Agency may extend, for a time not exceeding 1
year, the time within which the power boiler is required to be internally
inspected, subject to the following conditions and qualifications:
A) The analysis and treatment of feedwater for the power boilers
shall be under the supervision of a person qualified in the field of water
chemistry.
B) The analysis and treatment of the boiler feedwater shall be for
the purpose of controlling and limiting serious deteriorating, crusting and
sludge that affect the safety of the boiler.
C) The owner of the boilers shall maintain, for examination by the
Authorized Inspector, accurate records of chemical and physical laboratory analyses
of samples of the boiler water taken at regular intervals of not more than 24
hours operation and of the treatment applied. These records shall specify dates
and times of analyses, by whom analyzed, and the treatment applied at that time,
and shall be certified by the responsible authority. These records will
adequately show the conditions of the water and any constituents or
characteristics that are capable of producing corrosion or other deterioration
of the boiler or its parts.
D) Application for extension shall be in writing setting forth
facts establishing compliance with the foregoing conditions and qualifications
and shall be accompanied by the report of external inspection.
f) For each non-ISI boiler or pressure vessel, the owner shall
submit the following:
1) The information required by Section 505.2100;
2) On or before the expiration date of the Inspection Certificate
issued to the non-ISI boiler or pressure vessel:
A) The completed Report of Inspection or similar report form
documenting that the inspections were performed in accordance with the
inspection criteria and frequency requirements of subsection (a) and Section
505.2000.
B) All Code Data Reports and all other information related to the
repair, replacement or alteration of the non-ISI boiler or pressure vessel or
its appurtenances performed since the last Certificate Inspection.
g) The Agency shall take action under Section 505.80 if the Agency
finds that:
1) The submittals and notifications required by subsections (e)
and (f) have not been made or are incomplete; or
2) The inspections required by this Section have not been
performed or are incomplete; or
3) A change to the inspection frequency applied to the non-ISI
boiler or pressure vessel is not in accordance with subsection (e); or
4) The non-ISI boiler or pressure vessel was insured and the
insurance has been canceled or has otherwise become ineffective.
h) In addition to the requirements of this Section, owners shall
meet the requirements of Section 505.120.
i) Notwithstanding any other provision of this Section, an
Inspection Certificate shall remain valid beyond the expiration date noted on
the certificate until the boiler or pressure vessel is reinspected by the
Authorized Inspector or until the certificate is suspended by the Agency,
provided that the owner of the boiler or pressure vessel makes it available for
inspection at reasonable times.