35 Ill. Adm. Code 2010.201.160
Standards for Issuance
Section 201
TITLE 35: ENVIRONMENTAL PROTECTION
SUBTITLE B: AIR POLLUTION
CHAPTER I: POLLUTION CONTROL BOARD
SUBCHAPTER a: PERMITS AND GENERAL PROVISIONS
PART 201 PERMITS AND GENERAL PROVISIONS
SECTION 201.160 STANDARDS FOR ISSUANCE
Section 201.160 Standards
for Issuance
a) No construction permit shall be granted unless the applicant
submits proof to the Agency that:
1) The emission unit or air pollution control equipment will be
constructed or modified to operate so as not to cause a violation of the Act or
of this Chapter; and
2) If subject to a future compliance date, the applicant has an
approved compliance program and project completion schedule in accordance with
the provisions of Subpart H of this Part.
b) No operating permit shall be granted unless the applicant
submits proof to the Agency that:
1) The emission unit or air pollution control equipment has been
constructed or modified to operate so as not to cause a violation of the Act or
of this Chapter, or has been granted a variance therefrom by the Board and is
in full compliance with such variance; and
2) The emission unit or air pollution control equipment has been
constructed or modified in accordance with all conditions in the construction
permit, where applicable; and
3) The emission unit or air pollution control equipment has been
shown by tests in accordance with the provisions of Subpart J of this Part,
applicable regulations, and permit conditions to operate in accordance with the
emission limitations set forth in this Chapter, provided that the Agency may
waive the requirement for actual tests where sufficient standard testing
information is available; and
4) The applicant has taken all technically feasible measures,
including changes in work rules, to minimize the duration and frequency of
startups and to reduce the quantity of emissions during startup; and
5) If subject to a future compliance date, the applicant has an
approved compliance program and project completion schedule in accordance with
the provisions of Subpart H of this Part; and
6) If required, the applicant has an approved episode action plan
in effect in accordance with the provisions of 35 Ill. Adm. Code 244.