35 Ill. Adm. Code 187.406
Criteria for Approval of an EMSA
Section 187
Section 187.406 Criteria for
Approval of an EMSA
a) In accordance with Section 52.3-1 of the Act, the Agency may
approve an EMSA only if the sponsor demonstrates that the proposed pilot
project would:
1)
Achieve emissions reductions or reductions in discharges or
wastes beyond the otherwise applicable statutory and regulatory requirements
through pollution prevention or other suitable means; or
2)
Achieve real environmental risk reduction or foster
environmental compliance by other persons regulated under
the Act in a
manner that is clearly superior to the existing regulatory means
.
b) An EMSA under this Part shall contain adequate provisions to
ensure that its terms and conditions are performed by the sponsor. Performance
of the terms and conditions of an EMSA must be measurable and verifiable, and
shall be monitored, documented and reported by a sponsor in a clear and
complete manner.