35 Ill. Adm. Code 204.1500
Innovative Control Technology
Section 204.1500
Innovative Control Technology
a) An
owner or operator of a proposed major stationary source or major modification
may request that the Agency in writing no later than the close of the comment
period under 35 Ill. Adm. Code 252 to approve a system of innovative control
technology.
b) The Agency
shall, with the consent of the other affected State's Governor or other
affected States' respective Governors, determine that the source or
modification may employ a system of innovative control technology if:
1) The
proposed control system would not cause or contribute to an unreasonable risk
to public health, welfare, or safety in its operation or function;
2) The
owner or operator agrees to achieve a level of continuous emissions reduction
equivalent to that which would have been required under Section 204.1100(b), by
a date specified by the Agency. Such date shall not be later than 4 years
after the time of startup or 7 years after permit issuance;
3) The
source or modification would meet the requirements of Sections 204.1100 and
204.1110, based on the emissions rate that the stationary source employing the
system of innovative control technology would be required to meet on the date
specified by the Agency;
4) The
source or modification would not, before the date specified by the Agency:
A) Cause
or contribute to a violation of an applicable NAAQS; or
B) Impact
any area where an applicable increment is known to be violated;
5) All
other applicable requirements, including those for public participation, have
been met; and
6) The
provisions of Section 204.1200 (relating to Class I areas) have been satisfied
with respect to all periods during the life of the source or modification.
c) The Agency
shall withdraw any approval to employ a system of innovative control technology
made under this Section if:
1) The
proposed system fails by the specified date to achieve the required continuous
emissions reduction rate;
2) The
proposed system fails before the specified date so as to contribute to an
unreasonable risk to public health, welfare, or safety; or
3) The Agency
decides at any time that the proposed system is unlikely to achieve the required
level of control or to protect the public health, welfare, or safety.
d) If a
source or modification fails to meet the required level of continuous emissions
reduction within the specified time period or the approval is withdrawn in
accordance with subsection (c), the Agency may allow the source or modification
up to an additional 3 years to meet the requirement for the application of BACT
through use of a demonstrated system of control.