35 Ill. Adm. Code 215.512
Coke By-Product Recovery Plant Leaks
Section 215
Section 215.512 Coke
By-Product Recovery Plant Leaks
a) The owner or operator of a coke by-product recovery plant
shall conduct a visual inspection program designed to detect, identify, and
facilitate repair of leaks from components in light oil liquid service.
Components servicing coke oven gas lines, operating flare headers or vapor
recovery devices (including pressure relief devices) are exempt from the
inspection program.
b) In conducting such a program, the owner or operator of a coke
by-product recovery plant shall:
1) Develop and conduct a weekly inspection program consistent
with the provisions of Section 215.513.
2) Record all visible leaking components in light oil liquid
service and identify each component observed leaking consistent with the
provisions of Section 215.513.
3) Repair the leaking components as soon as practicable, but no
later than 21 days after the leak is discovered unless the leaking component
cannot be required until the unit is shut down or until parts needed to correct
the leak are available.