35 Ill. Adm. Code 215.628
Leaks
Section 215
Section 215.628Â Leaks
The owner or operator of a paint
or ink manufacturing plant shall, for the purpose of detecting leaks, conduct
an equipment monitoring program consistent with the following:
a)Â Â Â Â Â Â Â Â Each pump shall be checked by visual inspection each calendar
week for indications of leaks, that is, liquids dripping from the pump seal.Â
If there are indications of liquids dripping from the pump seal, the pump shall
be repaired as soon as practicable, but no later than 15 calendar days after
the leak is detected.
b)Â Â Â Â Â Â Â Â Any pump, valve, pressure relief valve, sampling connection,
open-ended valve, and flange or connector containing a fluid which is at least
10 percent by weight volatile organic material which appears to be leaking on
the basis of sight, smell, or sound shall be repaired as soon as practicable,
but no later than 15 calendar days after the leak is detected.
c)Â Â Â Â Â Â Â Â A weather proof, readily visible tag, in bright colors such as
red or yellow, bearing an identification number and the date on which the leak
was detected shall be attached to leaking equipment. The tag may be removed
upon repair, that is, when the equipment is adjusted or otherwise altered to
allow operation without leaking.
d)Â Â Â Â Â Â Â Â When a leak is detected, the owner or operator shall record
the date of detection and repair and the record shall be retained at the plant
for at least 2 years from the date of each detection or each repair attempt.
The record shall be made available to any person upon verbal or written request
during business hours.