35 Ill. Adm. Code 217.157
Testing and Monitoring
Section 217.157 Testing and Monitoring
a) Industrial Boilers and
Process Heaters
1) The
owner or operator of an industrial boiler subject to Subpart E of this Part
with a rated heat input capacity greater than 250 mmBtu/hr must install,
calibrate, maintain, and operate a CEMS on the emission unit for the
measurement of NO
x
emissions discharged into the atmosphere in
accordance with 40 CFR 75, as incorporated by reference in Section 217.104.
However, the owner or operator of an industrial boiler subject to Subpart E of
this Part with a rated heat input capacity greater than 250 mmBtu/hr that
combusts blast furnace gas with up to 10% natural gas on an annual basis and
located at a source that manufactures iron and steel is not required to
install, calibrate, maintain, and operate a CEMS on that industrial boiler,
provided the heat input from natural gas does not exceed 10% on an annual basis
and the owner or operator complies with the performance test requirements under
this Section and demonstrates, during each performance test, that NO
x
emissions from the industrial boiler are less than 70% of the applicable
emissions limitation under Section 217.164. If the owner or operator is unable
to meet the requirements of this exception, a CEMS is required within 12 months
after that event, or by January 1, 2015, whichever is later.
2) The
owner or operator of an industrial boiler subject to Subpart E of this Part
with a rated heat input capacity greater than 100 mmBtu/hr but less than or
equal to 250 mmBtu/hr must install, calibrate, maintain, and operate a CEMS on the
emission unit for the measurement of NO
x
emissions discharged into
the atmosphere in accordance with 40 CFR 60, subpart A and appendix B,
Performance Specifications 2 and 3, and appendix F, Quality Assurance
Procedures, as incorporated by reference in Section 217.104.
3) The
owner or operator of a process heater subject to Subpart F of this Part with a
rated heat input capacity greater than 100 mmBtu/hr must install, calibrate,
maintain, and operate a CEMS on the emission unit for the measurement of NO
x
emissions discharged into the atmosphere in accordance with 40 CFR 60, subpart
A and appendix B, Performance Specifications 2 and 3, and appendix F, Quality
Assurance Procedures, as incorporated by reference in Section 217.104.
4) On
and after July 1, 2025, the owner or operator of an industrial boiler subject
to Subpart E of this Part, or a process heater subject to Subpart F of this
Part, with a rated heat input capacity greater than 50 mmBtu/hr but less than
or equal to 100 mmBtu/hr must have an initial performance test conducted in
accordance with subsection (a)(8)(A) of this Section and Section 217.154, and
subsequent performance tests conducted in accordance with subsection (a)(8) of
this Section.
5) If
demonstrating compliance through an emissions averaging plan, the owner or
operator of an industrial boiler subject to Subpart E of this Part, or a
process heater subject to Subpart F of this Part, with a rated heat input
capacity less than or equal to 100 mmBtu/hr and not demonstrating compliance
through a CEMS must have an initial performance test conducted in accordance
with subsection (a)(8)(A) of this Section and Section 217.154, and subsequent
performance tests conducted in accordance with subsection (a)(8) of this
Section.
6) Instead
of complying with the requirements of subsection (a)(4) or (5) of this Section,
an owner or operator of an industrial boiler subject to Subpart E of this Part,
or a process heater subject to Subpart F of this Part, with a rated heat input
capacity less than or equal to 100 mmBtu/hr may install and operate a CEMS on the
emission unit in accordance with the applicable requirements of 40 CFR
60, subpart A and appendix B, Performance Specifications 2 and 3, and appendix
F, Quality Assurance Procedures, as incorporated by reference in Section
217.104. The CEMS must be used to demonstrate compliance with the applicable
emissions limitation or emissions averaging plan on an ozone season and annual
basis until July 1, 2025, and a 30-day rolling average on and after July 1,
2025.
7) Notwithstanding
subsection (a)(2) of this Section, the owner or operator of an auxiliary boiler
subject to Subpart E of this Part with a rated heat input capacity less than or
equal to 250 mmBtu/hr and a capacity factor of less than or equal to 20% is not
required to install, calibrate, maintain, and operate a CEMS on the boiler for
the measurement of NO
x
emissions discharged into the atmosphere, but
must conduct initial and subsequent performance tests in accordance with
subsection (a)(8) of this Section.
8) All
performance tests required by this subsection (a) must be conducted at the
owner or operator's sole expense and must meet the requirements in subsection
(a)(8)(A). All performance tests required by subsection (a) subsequent to an
initial performance test must also meet the requirements in subsection (a)(8)(B):
A) Except
as provided in subsection (a)(8)(C), the performance test must be conducted
using 40 CFR 60, subpart A and appendix A, Method 1, 2, 3, 4, 7E, or 19, in
appendix A-1, A-2, A-3, A-4, or A-7, respectively, as incorporated by reference
in Section 217.104, or other alternative USEPA methods approved by the Agency.
Each performance test must consist of three separate runs, each lasting a
minimum of 60 minutes. NO
x
emissions must be measured while the
industrial boiler or process heater is operating at maximum operating capacity
or while it is operating at normal maximum load. If the industrial boiler or
process heater has combusted more than one type of fuel in the prior year, a
separate performance test is required for each fuel. If a combination of fuels
is typically used, a performance test may be conducted, with Agency approval,
on the combination of fuels typically used.
B) A
performance test must be conducted at least once every five years. When, in
the opinion of the Agency or USEPA, it is necessary to conduct testing to
demonstrate compliance with Section 217.164 or 217.184, as applicable, the
owner or operator of an industrial boiler or process heater must have the test
conducted in accordance with the applicable test methods and procedures
specified in this Section within 90 days after receipt of a notice to test from
the Agency or USEPA.
C) Instead
of complying with the requirements of subsection (a)(8)(A) and with written
approval from the Agency and USEPA, the owner or operator of an industrial
boiler subject to Subpart E or a process heater subject to Subpart F, as
applicable, may utilize an alternative method to determine the emission rate
(lbs/mmBtu) for each fuel combusted in the prior year for units that share a
common
stack. The alternative method
must include the use of mass balance for units emitting through the common
stack where not all emissions units sharing that common stack are subject to
Subpart E or F, as applicable, provided there is adequate performance testing
and/or CEMS monitoring to determine emissions from the units subject to Subpart
E or F, as applicable, and where heat input is monitored for all emission units
served by the
common
stack. The owner or operator must comply
with all applicable provisions under this Section until written Agency and
USEPA approval to utilize the alternative method is received by the owner or
operator.
b) Glass
Melting Furnaces; Cement Kilns; Lime Kilns; Iron and Steel Reheat, Annealing,
and Galvanizing Furnaces; and Aluminum Reverberatory and Crucible Furnaces
1) An
owner or operator of a glass melting furnace subject to Subpart G of this Part,
cement kiln or lime kiln subject to Subpart H of this Part, iron and steel
reheat, annealing, or galvanizing furnace subject to Subpart I of this Part, or
aluminum reverberatory or crucible furnace subject to Subpart I of this Part
that has the potential to emit NO
x
in an amount equal to or greater
than one ton per day must install, calibrate, maintain, and operate a CEMS on the
emission unit for the measurement of NO
x
emissions discharged into
the atmosphere in accordance with 40 CFR 60, subpart A and appendix B,
Performance Specifications 2 and 3, and appendix F, Quality Assurance
Procedures, as incorporated by reference in Section 217.104.
2) An
owner or operator of a glass melting furnace subject to Subpart G of this Part,
cement kiln or lime kiln subject to Subpart H of this Part, iron and steel
reheat, annealing, or galvanizing furnace subject to Subpart I of this Part, or
aluminum reverberatory or crucible furnace subject to Subpart I of this Part
that has the potential to emit NO
x
in an amount less than one ton
per day must have an initial performance test conducted pursuant to subsection
(b)(4) of this Section and Section 217.154.
3) An
owner or operator of a glass melting furnace subject to Subpart G of this Part,
cement kiln or lime kiln subject to Subpart H of this Part, iron and steel
reheat, annealing, or galvanizing furnace subject to Subpart I of this Part, or
aluminum reverberatory or crucible furnace subject to Subpart I of this Part
that has the potential to emit NO
x
in an amount less than one ton
per day must have subsequent performance tests conducted pursuant to subsection
(b)(4) of this Section as follows:
A) All
the units, including those that are part of an emissions averaging plan, must
conduct subsequent performance tests at least once every five years; and
B) When,
in the opinion of the Agency or USEPA, it is necessary to conduct testing to
demonstrate compliance with Section 217.204, 217.224, or 217.244 of this Part,
as applicable, the owner or operator must, at his or her own expense, have the
test conducted in accordance with the applicable test methods and procedures
specified in this Section within 90 days after receipt of a notice to test from
the Agency or USEPA.
4) The
owner or operator of a glass melting furnace, cement kiln, or lime kiln must
have a performance test conducted using 40 CFR 60, subpart A and Methods 1, 2,
3, 4, or 7E in appendix A-1, A-2, A-3, or A-4, respectively, as incorporated by
reference in Section 217.104 of this Part, or other alternative USEPA methods
approved by the Agency. The owner or operator of an iron and steel reheat,
annealing, or galvanizing furnace, or aluminum reverberatory or crucible
furnace must have a performance test conducted using 40 CFR 60, subpart A and
Method 1, 2, 3, 4, 7E, or 19 in appendix A-1, A-2, A-3, A-4, or A-7,
respectively, as incorporated by reference in Section 217.104 of this Part, or
other alternative USEPA methods approved by the Agency. Each performance test
must consist of three separate runs, each lasting a minimum of 60 minutes. NO
x
emissions must be measured while the glass melting furnace, cement kiln, lime
kiln, iron and steel reheat, annealing, or galvanizing furnace, or aluminum
reverberatory or crucible furnace is operating at maximum capacity. If the
glass melting furnace, cement kiln, lime kiln, iron and steel reheat,
annealing, or galvanizing furnace, or aluminum reverberatory or crucible
furnace has combusted more than one type of fuel in the prior year, a separate
performance test is required for each fuel. Except as provided under
subsection (e) of this Section, this subsection (b)(4) does not apply if the
owner or operator is demonstrating compliance with an emissions limitation
through a CEMS under subsection (b)(1) or (b)(5) of this Section.
5) Instead
of complying with the requirements of subsections (b)(2), (b)(3), and (b)(4) of
this Section, an owner or operator of a glass melting furnace subject to
Subpart G of this Part, cement kiln or lime kiln subject to Subpart H of this
Part, iron and steel reheat, annealing, or galvanizing furnace subject to
Subpart I of this Part, or aluminum reverberatory or crucible furnace subject
to Subpart I of this Part that has the potential to emit NO
x
in an
amount less than one ton per day may install and operate a CEMS on the emission
unit in accordance with the applicable requirements of 40 CFR 60, subpart A and
appendix B, Performance Specifications 2 and 3, and appendix F, Quality
Assurance Procedures, as incorporated by reference in Section 217.104 of this
Part. The CEMS must be used to demonstrate compliance with the applicable
emissions limitation or emissions averaging plan on an ozone season and annual
basis until July 1, 2025, and a 30-day rolling average on and after July 1,
2025.
c) Fossil
Fuel-Fired Stationary Boilers. Until July 1, 2025, the owner or operator of a
fossil fuel-fired stationary boiler subject to Subpart M of this Part must
install, calibrate, maintain, and operate a CEMS on the emission unit for the
measurement of NO
x
emissions discharged into the atmosphere in
accordance with 40 CFR 96, subpart H. On and after July 1, 2025, the owner or
operator of a fossil fuel-fired stationary boiler subject to Subpart M of this
Part must install, calibrate, maintain, and operate a CEMS on the emission unit
for the measurement of NO
x
emissions discharged into the atmosphere
in accordance with 40 CFR 75.
d) Common
Stacks.
1) If
two or more emission units subject to Subpart E, F, G, H, I, M, or Q of this
Part are served by a common stack and the owner or operator of the emission
units is operating a CEMS, the owner or operator may, with written approval
from the Agency, use a single CEMS for the combination of emission units
subject to Subpart E, F, G, H, I, M, or Q of this Part that share the common
stack, provided the emission units are subject to an emissions averaging plan
under this Part.
2) If a
common stack serves emission units subject to Subpart E or F, as well as
emission units that are not subject to Subpart E or F, each emission unit
served by that common stack must be monitored by a CEMS and/or have had
performance testing conducted in accordance with subsection (a)(8) to determine
emissions from the emission units subject to Subpart E or F and heat input from
all emission units served by the common stack must be monitored.
3) Notwithstanding
subsection (d)(1), it is not required for all emission units sharing a common
stack to be part of an emissions averaging plan if the following criteria are
met:
A) Each
emission unit at the source subject to an emissions limitation in Subparts E or
F and not served by a common stack is demonstrating compliance with the
applicable emissions limitation on a unit basis.
B) The
common stack is monitored by either a CEMS in accordance with this Section or
performance testing in accordance with subsection (a)(8)(C) to demonstrate
compliance with the applicable emissions limitations.
e) Compliance
with the CEMS requirements by an owner or operator of an emission unit who is
required to install, calibrate, maintain, and operate a CEMS on the emission
unit under subsection (a)(1), (a)(2), (a)(3), or (b)(1) of this Section, or who
has elected to comply with the CEMS requirements under subsection (a)(6) or
(b)(5) of this Section, or who has elected to comply with the PEMS requirements
under subsection (f) of this Section, is required by the applicable compliance
date under Section 217.152 of this Subpart.
f) As an
alternative to complying with the requirements of this Section, other than the
requirements under subsections (a)(1) and (c) of this Section, the owner or
operator of an emission unit who is not otherwise required by any other
statute, regulation, or enforceable order to install, calibrate, maintain, and
operate a CEMS on the emission unit may comply with the specifications and test
procedures for a PEMS on the emission unit for the measurement of NO
x
emissions discharged into the atmosphere in accordance with the requirements of
40 CFR 60, subpart A and appendix B, Performance Specification 16. The PEMS
must be used to demonstrate compliance with the applicable emissions limitation
or emissions averaging plan on an ozone season and annual basis until July 1,
2025, and a 30-day rolling average on and after July 1, 2025.