35 Ill. Adm. Code 218.105
Test Methods and Procedures
Section 218
Section 218.105 Test Methods
and Procedures
a) Coatings, Inks and Fountain Solutions
The following
test methods and procedures shall be used to determine compliance of as applied
coatings, inks, and fountain solutions with the limitations set forth in this
Part.
1) Sampling: Samples collected for analyses shall be one-liter
taken into a one-liter container at a location and time such that the sample
will be representative of the coating as applied (i.e., the sample shall
include any dilution solvent or other VOM added during the manufacturing
process). The container must be tightly sealed immediately after the sample is
taken. Any solvent or other VOM added after the sample is taken must be
measured and accounted for in the calculations in subsection (a)(3) of this
Section. For multiple package coatings, separate samples of each component
shall be obtained. A mixed sample shall not be obtained as it will cure in the
container. Sampling procedures shall follow the guidelines presented in:
A) ASTM D 3925-81 (1985) standard practice for sampling liquid
paints and related pigment coating. This practice is incorporated by reference
in Section 218.112 of this Part.
B) ASTM E 300-86 standard practice for sampling industrial
chemicals. This practice is incorporated by reference in Section 218.112 of
this Part.
2) Analyses: The applicable analytical methods specified below
shall be used to determine the composition of coatings, inks, or fountain
solutions as applied.
A) Method 24 of 40 CFR 60, appendix A, incorporated by reference
in Section 218.112 of this Part, shall be used to determine the VOM content and
density of coatings. If it is demonstrated to the satisfaction of the Agency
and the USEPA that plant coating formulation data are equivalent to Method 24
results, formulation data may be used. In the event of any inconsistency between
a Method 24 test and a facility's formulation data, the Method 24 test will
govern.
B) Method 24A of 40 CFR 60, appendix A, incorporated by reference
in Section 218.112 of this Part, shall be used to determine the VOM content and
density of rotogravure printing inks and related coatings. If it is
demonstrated to the satisfaction of the Agency and USEPA that the plant coating
formulation data are equivalent to Method 24A results, formulation data may be
used. In the event of any inconsistency between a Method 24A test and
formulation data, the Method 24A test will govern.
C) The following ASTM methods are the analytical procedures for
determining VOM:
i) ASTM D 1475-85: Standard test method for density of paint,
varnish, lacquer and related products. This test method is incorporated by
reference in Section 218.112 of this Part.
ii) ASTM D 2369-87: Standard test method for volatile content of
a coating. This test method is incorporated by reference in Section 218.112 of
this Part.
iii) ASTM D 3792-86: Standard test method for water content of
water-reducible paints by direct injection into a gas chromatograph. This test
method is incorporated by reference in Section 218.112 of this Part.
iv) ASTM D 4017-81 (1987): Standard test method for water content
in paints and paint materials by the Karl Fischer method. This test method is
incorporated by reference in Section 218.112 of this Part.
v) ASTM D 4457-85: Standard test method for determination of
dichloromethane and 1,1,1, trichloroethane in paints and coatings by direct
injection into a gas chromatograph. (The procedure delineated above can be
used to develop protocols for any compounds specifically exempted from the
definition of VOM.) This test method is incorporated by reference in Section
218.112 of this Part.
vi) ASTM D 2697-86: Standard test method for volume non-volatile
matter in clear or pigmented coatings. This test method is incorporated by
reference in Section 218.112 of this Part.
vii) ASTM D 3980-87: Standard practice for interlaboratory testing
of paint and related materials. This practice is incorporated by reference in
Section 218.112 of this Part.
viii) ASTM E 180-85: Standard practice for determining the
precision data of ASTM methods for analysis of and testing of industrial
chemicals. This practice is incorporated by reference in Section 218.112 of
this Part.
ix) ASTM D 2372-85: Standard method of separation of vehicle from
solvent-reducible paints. This method is incorporated by reference in Section
218.112 of this Part.
D) Use of an adaptation to any of the analytical methods specified
in subsections (a)(2)(A), (B), and (C) of this Section may not be used unless approved
by the Agency and USEPA. An owner or operator must submit sufficient
documentation for the Agency and USEPA to find that the analytical methods
specified in subsections (a)(2)(A), (B), and (C) of this Section will yield
inaccurate results and that the proposed adaptation is appropriate.
3) Calculations: Calculations for determining the VOM content,
water content and the content of any compounds which are specifically exempted
from the definition of VOM of coatings, inks and fountain solutions as applied
shall follow the guidance provided in the following documents:
A) "A Guide for Surface Coating Calculation",
EPA-340/1-86-016, incorporated by reference in Section 218.112 of this Part.
B) "Procedures for Certifying Quantity of Volatile Organic
Compounds Emitted by Paint, Ink and Other Coatings" (revised June 1986),
EPA-450/3-84-019, incorporated by reference in Section 218.112 of this Part.
C) "A Guide for Graphic Arts Calculations", August 1988,
EPA-340/1-88-003, incorporated by reference in Section 218.112 of this Part.
b) Automobile or Light-Duty Truck Test Protocol
1) The protocol for testing, including determining the transfer
efficiency of coating applicators, at primer surfacer operations and topcoat
operations at an automobile or light-duty truck assembly source shall follow
the procedures in the following:
A) Prior to May 1, 2012: "Protocol for Determining the Daily
Volatile Organic Compound Emission Rate of Automobile and Light-Duty Truck
Topcoat Operations" ("topcoat protocol"), December 1988,
EPA-450/3-88-018, incorporated by reference in Section 218.112 of this Part.
B) On and
after May 1, 2012: "Protocol for Determining the Daily Volatile Organic
Compound Emission Rate of Automobile and Light-Duty Truck Primer-Surfacer and
Topcoat Operations" (topcoat protocol), September 2008, EPA-453/R-08-002,
incorporated by reference in Section 218.112 of this Part.
2) Prior to testing pursuant to the applicable topcoat protocol,
the owner or operator of a coating operation subject to the topcoat or primer
surfacer limit in Section 218.204(a)(1)(B), (a)(1)(C), (a)(2)(B), (a)(2)(C), or
(a)(2)(E) shall submit a detailed testing proposal specifying the method by
which testing will be conducted and how compliance will be demonstrated
consistent with the applicable topcoat protocol. The proposal shall include,
at a minimum, a comprehensive plan (including a rationale) for determining the
transfer efficiency at each booth through the use of in-plant or pilot testing,
the selection of coatings to be tested (for the purpose of determining transfer
efficiency) including the rationale for coating groupings, the method for
determining the analytic VOM content of as applied coatings and the formulation
solvent content of as applied coatings, and a description of the records of
coating VOM content as applied and coating's usage that will be kept to demonstrate
compliance. Upon approval of the proposal by the Agency and USEPA, the
compliance demonstration for a coating line may proceed.
c) Capture System Efficiency Test Protocols
1) Applicability
The
requirements of subsection (c)(2) of this Section shall apply to all VOM
emitting process emission units employing capture equipment (e.g., hoods,
ducts), except those cases noted in this subsection (c)(1).
A) If an emission unit is equipped with (or uses) a permanent
total enclosure (PTE) that meets Agency and USEPA specifications, and which
directs all VOM to a control device, then the emission unit is exempted from
the requirements described in subsection (c)(2) of this Section. The Agency
and USEPA specifications to determine whether a structure is considered a PTE
are given in Method 204 of appendix M of 40 CFR 51, incorporated by reference
in Section 218.112 of this Part. In this instance, the capture efficiency is
assumed to be 100 percent and the emission unit is still required to measure
control efficiency using appropriate test methods as specified in subsection
(d) of this Section.
B) If an emission unit is equipped with (or uses) a control device
designed to collect and recover VOM (e.g., carbon adsorber), an explicit
measurement of capture efficiency is not necessary provided that the conditions
given below are met. The overall control of the system can be determined by
directly comparing the input liquid VOM to the recovered liquid VOM. The
general procedure for use in this situation is given in 40 CFR 60.433,
incorporated by reference in Section 218.112 of this Part, with the following
additional restrictions:
i) Unless otherwise specified in subsection (c)(1)(B)(ii), the
owner or operator shall obtain data each operating day for the solvent usage
and solvent recovery to permit the determination of the solvent recovery
efficiency of the system each operating day using a 7-day rolling period. The
recovery efficiency for each operating day is computed as the ratio of the
total recovered solvent for that day and the most recent prior 6 operating days
to the total solvent usage for the same 7-day period used for the recovered
solvent, rather than a 30-day weighted average as given in 40 CFR 60.433
incorporated by reference at Section 218.112 of this Part. This ratio shall be
expressed as a percentage. The ratio shall be computed within 72 hours
following each 7-day period. A source that believes that the 7-day rolling
period is not appropriate may use an alterative multi-day rolling period not to
exceed 30 days, with the approval of the Agency and USEPA. In addition, the
criteria in subsection (c)(1)(B)(iii) or subsection (c)(1)(B)(iv) must be met.
ii) The owner or operator of the source engaged in printing
located at 350 E. 22
nd
Street, Chicago, Illinois, shall obtain data
each operating day for the solvent usage and solvent recovery to permit the
determination of the solvent recovery efficiency of the system each operating
day using a 14-day rolling period. The recovery efficiency for each operating
day is computed as the ratio of the total recovered solvent for that day and
the most recent prior 13 operating days to the total solvent usage for the same
14-day period used for the recovered solvent, rather than a 30-day weighted
average as given in 40 CFR 60.433, incorporated by reference in Section 218.112
of this Part. This ratio shall be expressed as a percentage. The ratio shall
be computed within 17 days following each 14-day period. In addition, the
criteria in subsection (c)(1)(B)(iii) or subsection (c)(1)(B)(iv) must be met.
iii) The solvent recovery system (i.e., capture and control
system) must be dedicated to a single coating line, printing line, or other
discrete activity that by itself is subject to an applicable VOM emission
standard, or
iv) If the solvent recovery system controls more than one coating
line, printing line or other discrete activity that by itself is subject to an
applicable VOM emission standard, the overall control (i.e., the total
recovered VOM divided by the sum of liquid VOM input from all lines and other
activities venting to the control system) must meet or exceed the most
stringent standard applicable to any line or other discrete activity venting to
the control system.
2) Capture Efficiency Protocols
The capture
efficiency of an emission unit shall be measured using one of the protocols
given below. Appropriate test methods to be utilized in each of the capture
efficiency protocols are described in appendix M of 40 CFR 51, incorporated by
reference at Section 218.112 of this Part. Any error margin associated with a
test method or protocol may not be incorporated into the results of a capture
efficiency test. If these techniques are not suitable for a particular
process, then an alternative capture efficiency protocol may be used, pursuant
to the provisions of Section 218.108(b) of this Part.
A) Gas/gas method using temporary total enclosure (TTE). The
Agency and USEPA specifications to determine whether a temporary enclosure is
considered a TTE are given in Method 204 of appendix M of 40 CFR 51,
incorporated by reference in Section 218.112 of this Part. The capture
efficiency equation to be used for this protocol is:
where:
CE
=
Capture efficiency, decimal
fraction;
G
w
=
Mass of VOM captured and
delivered to control device using a TTE;
F
w
=
Mass of uncaptured VOM that
escapes from a TTE.
Method 204B or
204C contained in appendix M of 40 CFR 51, incorporated by reference in Section
218.112 of this Part, is used to obtain G
w
. Method 204D in appendix
M of 40 CFR 51, incorporated by reference in Section 218.112 of this Part, is
used to obtain F
w
.
B) Liquid/gas method using TTE. The Agency and USEPA
specifications to determine whether a temporary enclosure is considered a TTE
are given in Method 204 of appendix M of 40 CFR 51, incorporated by reference
in Section 218.112 of this Part. The capture efficiency equation to be used
for this protocol is:
where:
CE
=
Capture efficiency, decimal
fraction;
L
=
Mass of liquid VOM input to
process emission unit;
F
w
=
Mass of uncaptured VOM that
escapes from a TTE.
Method 204A or
204F contained in appendix M of 40 CFR 51, incorporated by reference in Section
218.112 of this Part, is used to obtain L. Method 204 D in appendix M of 40 CFR
51, incorporated by reference in Section 218.112 of this Part, is used to
obtain F
w
.
C) Gas/gas method using the building or room (building or room
enclosure), in which the affected coating line, printing line or other emission
unit is located, as the enclosure as determined by Method 204 of appendix M of
40 CFR 51, incorporated by reference in Section 218.112 of this Part, and in
which "F
B
" and "G" are measured while operating
only the affected line or emission unit. All fans and blowers in the building
or room must be operated as they would under normal production. The capture
efficiency equation to be used for this protocol is:
where:
CE
=
Capture efficiency, decimal
fraction;
G
=
Mass of VOM captured and
delivered to control device;
F
B
=
Mass of uncaptured VOM that
escapes from building enclosure.
Method 204B or 204C contained in appendix M of 40 CFR 51,
incorporated by reference in Section 218.112 of this Part is used to obtain G. Method
204E in appendix M of 40 CFR 51, incorporated by reference in Section 218.112
of this Part is used to obtain F
B
.
D) Liquid/gas method using the building or room (building or room
enclosure), in which the affected coating line, printing line or other emission
unit is located, as the enclosure as determined by Method 204 of appendix M of
40 CFR 51, incorporated by reference in Section 218.112 of this Part, and in
which "F
B
" and "L" are measured while operating
only the affected line or emission unit. All fans and blowers in the building
or room must be operated as they would under normal production. The capture
efficiency equation to be used for this protocol is:
where:
CE
=
Capture efficiency, decimal
fraction;
L
=
Mass of liquid VOM input to
process emission unit;
F
B
=
Mass of uncaptured VOM that
escapes from building enclosure.
Method 204A or 204F contained in appendix M of 40 CFR 51, incorporated by
reference in Section 218.112 of this Part is used to obtain L. Method 204E in appendix
M of 40 CFR 51, incorporated by reference in Section 218.112 of this Part is
used to obtain F
B
.
E) Mass
balance using Data Quality Objective (DQO) or Lower Confidence Limit (LCL)
protocol. For a liquid/gas input where an owner or operator is using the
DQO/LCL protocol and not using an enclosure as described in Method 204 of appendix
M of 40 CFR 51, incorporated by reference in Section 218.112 of this Part, the
VOM content of the liquid input (L) must be determined using Method 204A or
204F in appendix M of 40 CFR 51, incorporated by reference in Section 218.112
of this Part. The VOM content of the captured gas stream (G) to the control
device must be determined using Method 204B or 204C in appendix M of 40 CFR 51,
incorporated by reference in Section 218.112 of this Part. The results of
capture efficiency calculations (G/L) must satisfy the DQO or LCL statistical
analysis protocol as described in Section 3 of USEPA's "Guidelines for
Determining Capture Efficiency," incorporated by reference at Section 218.112
of this Part. Where capture efficiency testing is done to determine emission
reductions for the purpose of establishing emission credits for offsets,
shutdowns, and trading, the LCL protocol cannot be used for these
applications. In enforcement cases, the LCL protocol cannot confirm non-compliance;
capture efficiency must be determined using a protocol under subsection
(c)(2)(A), (B), (C) or (D) of this Section, the DQO protocol of this subsection
(c)(2)(E), or an alternative protocol pursuant to Section 218.108(b) of this
Part.
BOARD NOTE: Where LCL was used
in testing emission units that are the subject of later requests for
establishing emission credits for offsets, shutdowns, and trading, prior LCL
results may not be relied upon to determine the appropriate amount of credits.
Instead, to establish the appropriate amount of credits, additional testing may
be required that would satisfy the protocol of Section 218.105(c)(2)(A), (B),
(C) or (D), the DQO protocol of Section 218.105(c)(2)(E), or an alternative
protocol pursuant to Section 218.108(b) of this Part.
3) Simultaneous
testing of multiple lines or emission units with a common control device. If
an owner or operator has multiple lines sharing a common control device, the
capture efficiency of the lines may be tested simultaneously, subject to the
following provisions:
A) Multiple
line testing must meet the criteria of Section 4 of USEPA's "Guidelines
for Determining Capture Efficiency, " incorporated by reference at Section
218.112 of this Part;
B) The
most stringent capture efficiency required for any individual line or unit must
be met by the aggregate of lines or units; and
C) Testing
of all the lines of emission units must be performed with the same capture
efficiency test protocol.
4) Recordkeeping and Reporting
A) All owners or operators affected by this subsection must
maintain a copy of the capture efficiency protocol submitted to the Agency and
the USEPA on file. All results of the appropriate test methods and capture
efficiency protocols must be reported to the Agency within 60 days after the
test date. A copy of the results must be kept on file with the source for a
period of 3 years.
B) If any changes are made to capture or control equipment, then
the source is required to notify the Agency and the USEPA of these changes and
a new test may be required by the Agency or the USEPA.
C) The source must notify the Agency 30 days prior to performing
any capture efficiency or control test. At that time, the source must notify
the Agency which capture efficiency protocol and control device test methods
will be used. Notification of the actual date and expected time of testing
must be submitted a minimum of 5 working days prior to the actual date of the
test. The Agency may at its discretion accept notification with shorter
advance notice provided that such arrangements do not interfere with the Agency's
ability to review the protocol or observe testing.
D) Sources utilizing a PTE must demonstrate that this enclosure
meets the requirements given in Method 204 in appendix M of 40 CFR 51,
incorporated by reference in Section 218.112 of this Part, for a PTE during any
testing of their control device.
E) Sources utilizing a TTE must demonstrate that their TTE meets
the requirements given in Method 204 in appendix M of 40 CFR 51, incorporated
by reference in Section 218.112 of this Part, for a TTE during testing of their
control device. The source must also provide documentation that the quality
assurance criteria for a TTE have been achieved.
F) Any
source utilizing the DQO or LCL protocol must submit the following information
to the Agency with each test report:
i) A
copy of all test methods, Quality Assurance/Quality Control procedures, and
calibration procedures to be used from those described in appendix M of 40 CFR
51, incorporated by reference in Section 218.112 of this Part;
ii) A
table with information on each sample taken, including the sample
identification and the VOM content of the sample;
iii) The quantity of material
used for each test run;
iv) The quantity of
captured VOM for each test run;
v) The
capture efficiency calculations and results for each test run;
vi) The DQO and/or LCL
calculations and results; and
vii) The
Quality Assurance/Quality Control results, including how often the instruments
were calibrated, the calibration results, and the calibration gases used.
d) Control Device Efficiency Testing and Monitoring
1) The control device efficiency shall be determined by
simultaneously measuring the inlet and outlet gas phase VOM concentrations and
gas volumetric flow rates in accordance with the gas phase test methods
specified in subsection (f) of this Section.
2) An owner or operator:
A) That uses an afterburner or carbon adsorber to comply with any
Section of Part 218 shall use Agency and USEPA approved continuous monitoring
equipment which is installed, calibrated, maintained, and operated according to
vendor specifications at all times the control device is in use except as
provided in subsection (d)(3) of this Section. The continuous monitoring
equipment must monitor the following parameters:
i) For each afterburner which does not have a catalyst bed, the
combustion chamber temperature of each afterburner.
ii) For each afterburner which has a catalyst bed, commonly known
as a catalytic afterburner, the temperature rise across each catalytic afterburner
bed or VOM concentration of exhaust.
iii) For each carbon adsorber, the VOM concentration of each
carbon adsorption bed exhaust or the exhaust of the bed next in sequence to be
desorbed.
B) Must install, calibrate, operate and maintain, in accordance
with manufacturer's specifications, a continuous recorder on the temperature
monitoring device, such as a strip chart, recorder or computer, having an
accuracy of ± 1 percent of the temperature measured in degrees Celsius or ± 0.5
o
C, whichever is greater.
C) Of an automobile or light-duty truck primer surfacer operation
or topcoat operation subject to subsection (d)(2)(A), shall keep a separate
record of the following data for the control devices, unless alternative
provisions are set forth in a permit pursuant to Title V of the Clean Air Act:
i) For thermal afterburners for which combustion chamber
temperature is monitored, all 3-hour periods of operation in which the average
combustion temperature was more than 28°C (50°F) below the average combustion
temperature measured during the most recent performance test that demonstrated
that the operation was in compliance.
ii) For catalytic afterburners for which temperature rise is
monitored, all 3-hour periods of operation in which the average gas temperature
before the catalyst bed is more than 28°C (50°F) below the average gas
temperature immediately before the catalyst bed measured during the most recent
performance test that demonstrated that the operation was in compliance.
iii) For catalytic afterburners and carbon adsorbers for which VOM
concentration is monitored, all 3-hour periods of operation during which the
average VOM concentration or the reading of organics in the exhaust gases is
more than 20 percent greater than the average exhaust gas concentration or
reading measured by the organic monitoring device during the most recent
determination of the recovery efficiency of a carbon adsorber or performance
test for a catalytic afterburner, which determination or test demonstrated that
the operation was in compliance.
3) An owner or operator that uses a carbon adsorber to comply
with Section 218.401 of this Part may operate the adsorber during periods of
monitoring equipment malfunction, provided that:
A) The owner or operator notifies in writing the Agency within, 10
days after the conclusion of any 72 hour period during which the adsorber is
operated and the associated monitoring equipment is not operational, of such
monitoring equipment failure and provides the duration of the malfunction, a
description of the repairs made to the equipment, and the total to date of all
hours in the calendar year during which the adsorber was operated and the
associated monitoring equipment was not operational;
B) During such period of malfunction the adsorber is operated
using timed sequences as the basis for periodic regeneration of the adsorber;
C) The period of such adsorber operation does not exceed 360 hours
in any calendar year without the approval of the Agency and USEPA; and
D) The total of all hours in the calendar year during which the
adsorber was operated and the associated monitoring equipment was not
operational shall be reported, in writing, to the Agency and USEPA by January
31 of the following calendar year.
e) Overall Efficiency
1) The overall efficiency of the emission control system shall be
determined as the product of the capture system efficiency and the control
device efficiency or by the liquid/liquid test protocol as specified in 40 CFR
60.433, incorporated by reference in Section 218.112 of this Part, (and revised
by subsection (c)(1)(B) of this Section) for each solvent recovery system. In
those cases in which the overall efficiency is being determined for an entire
line, the capture efficiency used to calculate the product of the capture and
control efficiency is the total capture efficiency over the entire line.
2) For coating lines which are both chosen by the owner or
operator to comply with Section 218.207(c), (d), (e), (f), (g), (m), or (n) of
this Part by the alternative in Section 218.207(b)(2) of this Part and meet the
criteria allowing them to comply with Section 218.207 of this Part instead of
Section 218.204 of this Part, the overall efficiency of the capture system and
control device, as determined by the test methods and procedures specified in
subsections (c), (d) and (e)(1) of this Section, shall be no less than the
equivalent overall efficiency which shall be calculated by the following
equation:
where:
E
=
Equivalent overall efficiency
of the capture system and control device as a percentage;
VOM
a
=
Actual VOM content of a
coating, or the daily-weighted average VOM content of two or more coatings
(if more than one coating is used), as applied to the subject coating line as
determined by the applicable test methods and procedures specified in
subsection (a) of this Section in units of kg VOM/1 (lb VOM/gal) of coating
solids as applied;
VOM
l
=
The VOM emission limit
specified in Section 218.204 or 218.205 of this Part in units of kg VOM/ℓ
(lb VOM/gal) of coating solids as applied.
f) Volatile Organic Material Gas Phase Source Test Methods.
The methods in 40 CFR 60, appendix A, incorporated by
reference in Section 218.112 of this Part delineated below shall be used to
determine control device efficiencies.
1) 40 CFR 60, appendix A, Method 18, 25 or 25A, incorporated by
reference in Section 218.112 of this Part as appropriate to the conditions at
the site, shall be used to determine VOM concentration. Method selection shall
be based on consideration of the diversity of organic species present and their
total concentration and on consideration of the potential presence of
interfering gases. Except as indicated in subsections (f)(1)(A) and (B) below,
the test shall consist of three separate runs, each lasting a minimum of 60 minutes,
unless the Agency and the USEPA determine that process variables dictate
shorter sampling times.
A) When the method is to be used to determine the efficiency of a
carbon adsorption system with a common exhaust stack for all the individual adsorber
vessels, the test shall consist of three separate runs, each coinciding with
one or more complete sequences through the adsorption cycles of all the
individual absorber vessels.
B) When the method is to be used to determine the efficiency of a
carbon adsorption system with individual exhaust stacks for each absorber
vessel, each adsorber vessel shall be tested individually. The test for each absorber
vessel shall consist of three separate runs. Each run shall coincide with one
or more complete adsorption cycles.
2) 40 CFR 60, appendix A, Method 1 or 1A, incorporated by
reference in Section 218.112 of this Part, shall be used for sample and
velocity traverses.
3) 40 CFR 60, appendix A, Method 2, 2A, 2C or 2D, incorporated by
reference in Section 218.112 of this Part, shall be used for velocity and
volumetric flow rates.
4) 40 CFR 60, appendix A, Method 3, incorporated by reference in
Section 218.112 of this Part, shall be used for gas analysis.
5) 40 CFR 60, appendix A, Method 4, incorporated by reference in
Section 218.112 of this Part, shall be used for stack gas moisture.
6) 40 CFR 60, appendix A, Methods 2, 2A, 2C, 2D, 3 and 4,
incorporated by reference in Section 218.112 of this Part, shall be performed,
as applicable, at least twice during each test run.
7) Use of an adaptation to any of the test methods specified in
subsections (f)(1), (2), (3), (4), (5) and (6) of this Section may not be used
unless approved by the Agency and the USEPA on a case by case basis. An owner
or operator must submit sufficient documentation for the Agency and the USEPA
to find that the test methods specified in subsections (f)(1), (2), (3), (4),
(5) and (6) of this Section will yield inaccurate results and that the proposed
adaptation is appropriate.
g) Leak Detection Methods for Volatile Organic Material
Owners or operators required by this Part to carry out a leak
detection monitoring program shall comply with the following requirements:
1) Leak Detection Monitoring
A) Monitoring shall comply with 40 CFR 60, appendix A, Method 21,
incorporated by reference in Section 218.112 of this Part.
B) The detection instrument shall meet the performance criteria of
Method 21.
C) The instrument shall be calibrated before use on each day of
its use by the methods specified in Method 21.
D) Calibration gases shall be:
i) Zero air (less than 10 ppm of hydrocarbon in air); and
ii) A mixture of methane or n-hexane and air at a concentration
of approximately, but no less than, 10,000 ppm methane or n-hexane.
E) The instrument probe shall be traversed around all potential
leak interfaces as close to the interface as possible as described in Method
21.
2) When equipment is tested for compliance with no detectable
emissions as required, the test shall comply with the following requirements:
A) The requirements of subsections (g)(1)(A) through (g)(1)(E) of
this Section shall apply.
B) The background level shall be determined as set forth in Method
21.
3) Leak detection tests shall be performed consistent with:
A) "APTI Course SI 417 controlling Volatile Organic Compound
Emissions from Leaking Process Equipment", EPA-450/2-82-015, incorporated
by reference in Section 218.112 of this Part.
B) "Portable Instrument User's Manual for Monitoring VOC
Sources", EPA-340/1-86-015, incorporated by reference in Section 218.112
of this Part.
C) "Protocols for Generating Unit-Specific Emission Estimates
for Equipment Leaks of VOC and VHAP", EPA-450/3-88-010, incorporated by
reference in Section 218.112 of this Part.
D) "Petroleum Refinery Enforcement Manual",
EPA-340/1-80-008, incorporated by reference in Section 218.112 of this Part.
h) Bulk Gasoline Delivery System Test Protocol
1) The method for determining the emissions of gasoline from a
vapor recovery system are delineated in 40 CFR 60, Subpart XX, section 60.503,
incorporated by reference in Section 218.112 of this Part.
2) Other tests shall be performed consistent with:
A) "Inspection Manual for Control of Volatile Organic
Emissions from Gasoline Marketing Operations: Appendix D",
EPA-340/1-80-012, incorporated by reference in Section 218.112 of this Part.
B) "Control of Hydrocarbons from Tank Truck Gasoline Loading
Terminals: Appendix A", EPA-450/2-77-026, incorporated by reference in
Section 218.112 of this Part.
i) Notwithstanding other requirements of this Part, upon request
of the Agency where it is necessary to demonstrate compliance, an owner or
operator of an emission unit which is subject to this Part shall, at his own
expense, conduct tests in accordance with the applicable test methods and
procedures specific in this Part. Nothing in this Section shall limit the
authority of the USEPA pursuant to the Clean Air Act, as amended, to require
testing.
j) Stage II Gasoline Vapor Recovery Test Methods
The methods for determining the acceptable performance of
Stage II Gasoline Vapor Recovery System are delineated in "Technical
Guidance-Stage II Vapor Recovery Systems for Control of Vehicle Refueling
Emissions at Gasoline Dispensing Facilities," found at EPA 450/3-91-022b
and incorporated by reference in Section 218.112 of this Part. Specifically,
the test methods are as follows:
1) Dynamic Backpressure Test is a test procedure used to
determine the pressure drop (flow resistance) through balance vapor collection
and control systems (including nozzles, vapor hoses, swivels, dispenser piping
and underground piping) at prescribed flow rates.
2) Pressure Decay/Leak Test is a test procedure used to quantify
the vapor tightness of a vapor collection and control system installed at
gasoline dispensing facilities.
3) Liquid Blockage Test is a test procedure used to detect low
points in any vapor collection and control system where condensate may
accumulate.